Lignite excavators extract coal in the Welzow open-cast mine, operated by LEAG. The lignite is burnt in the Schwarze Pumpe and Jänschwalde power plants to generate electricity. The phase-out of coal-fired power generation is to take place by 2038, 11.11.2021
Caption

Lignite excavators extract coal in the Welzow open-cast mine, operated by LEAG. The lignite is burnt in the Schwarze Pumpe and Jänschwalde power plants to generate electricity. The phase-out of coal-fired power generation is to take place by 2038, 11.11.2021

Credit line

Photo12/imageBROKER/Jochen Eckel

Reference

BRK24E56_449

Model release

NA

Property release

No

License type

Rights managed

Available size

71,7Mb (2,1Mb) / 20,4in x 13,6in / 6130 x 4087 (300dpi)

Please log in to download the high resolution file