Construction of a new line route, 380 KV extra-high voltage line between Osterath and Gohr, near Neuss, fitters in cable trolleys, on the conductor cables, installing field spacers at great heights, wind power station, North Rhine-Westphalia, Germany, Europe
Caption

Construction of a new line route, 380 KV extra-high voltage line between Osterath and Gohr, near Neuss, fitters in cable trolleys, on the conductor cables, installing field spacers at great heights, wind power station, North Rhine-Westphalia, Germany, Europe

Credit line

Photo12/imageBROKER/Jochen Tack

Reference

BRK24E70_021

Model release

NA

Property release

No

License type

Rights managed

Available size

120,7Mb (4,4Mb) / 26,5in x 17,7in / 7952 x 5304 (300dpi)

Keywords

Cable route Central Europe Construction site Environmental friendly Europe FRG Federal State of North Rhine-Westphalia German German Federal Republic Germany HV line HV power line HV transmission line Manpower Means of transport Middle Europe NRW Neuss No People North Rhine-Westphalia North-Rhine Westphalia Overhead line Overhead power line Power generation Republic of Germany Rhineland Staff Wind energy wheel Windpower generator aerial line alternative energy altitude assemble big building building site built built in bunch of cable care conductor rope construct construction construction site construction work deserted eco-friendly ecofriendly ecological awareness electric electric pylon electrical electricity electricity generation electricity pole electricity pylon electricity supply empty energy energy industry energy production energy source energy supply environment environment protection environmental awareness environmental conservation environmental issue environmental protection environmentally friendly erect erection european generation of current generation of electricity generator great green energy groom height high high voltage high voltage pylon high voltage tower high-voltage high-voltage line high-voltage mast high-voltage pylon high-voltage transmission line infrastructure install installation labor labour labourer large line linesman lineworker mast means of transportation mechanic multiple new new building new construction newly no one nobody nurse open wire overhead line overhead line fitters overhead lineman overhead linesman overhead power line overhead transmission line overhead wire pole power generation power industry power line power pole power pylon power supply power supply line propeller pylon rail rail traffic railroad railroad line railroad track railway railway line railway section railway track

Please log in to download the high resolution file