
Caption
Reick gasworks, 1907 08 Hans Erlwein designed the gas tank of the municipal gasworks in Reick, a cylinder with a diameter of 60 metres. Gas operations ceased in 1973, and after reunification there were ambitious plans to build a musical theatre (for the musical Sissi) inside the shell
Date
Jul 29, 2007
Credit line
Photo12/imageBROKER/Sylvio Dittrich
Reference
BRK24G12_296
Model release
No
Property release
No
License type
Rights managed
Available size
27,2Mb (1,8Mb) / 12,6in x 8,4in / 3780 x 2515 (300dpi)