Motorway construction site on the A52 in Essen, basic renovation of the two carriageways in both directions, over 8 years, here the construction of concrete crash barriers between the carriageways, using the so-called sliding construction method, around 500 metres of concrete crash barrier, crash barrier is built per day, North Rhine-Westphalia, Essen
Caption

Motorway construction site on the A52 in Essen, basic renovation of the two carriageways in both directions, over 8 years, here the construction of concrete crash barriers between the carriageways, using the so-called sliding construction method, around 500 metres of concrete crash barrier, crash barrier is built per day, North Rhine-Westphalia, Essen

Date

May 11, 2023

Credit line

Photo12/imageBROKER/Jochen Tack

Reference

BRK24I17_435

Model release

No

Property release

No

License type

Rights managed

Available size

172,3Mb (8,4Mb) / 31,7in x 21,1in / 9504 x 6336 (300dpi)

Keywords

meter meters metre metres concrete concrete direction directions daytime day daylight construction equipment construction equipment construction site construction sites building site building sites construction constructions Construction site wall walls machine machines maschinery highway highways freeway motorway guardrail guardrails guard rail guard rails crash barrier crash barriers road traffic road traffic road transport street traffic transport transports transportation traffic traffic orientation navigation year years North Rhine-Westphalia NRW Federal State of North Rhine-Westphalia North-Rhine Westphalia German Europe Europe's construction work construction works building cement mixer cement mixers concrete mixer long distance traffic long distance traffic roadside roadsides road side highway highways freeway road roads street streets Straße road lane roadway renovate renovating renovates construction machine construction machines Construction machinery Construction machineries infrastructure infrastructures european five hundred 500 repair repairs median strip median strips medial strip renovation renovations restoration restorations renewal redevelopment restructuring restructurings overhaul refurbishment Germany German Federal Republic Republic of Germany FRG BRD Three People 3 people three persons concrete concretes concreting highway road works highway road works Essen protective wall protective walls A 52 A52 Central Europe Middle Europe Concrete wall Conversion work Conversion works Directional carriageway Concrete crash barrier

Please log in to download the high resolution file