
Caption
Preparation for the demolition of the tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines are demolished, 2 new Siemens SG6.6-170 wind turbines replace them, the WTGs produce twice as much energy, 12 MW power, as the 5 old wind turbines, called repowering, Werl, North Rhine-Westphalia, Germany, Europe
Date
Jun 19, 2024
Credit line
Photo12/imageBROKER/Jochen Tack
Reference
BRK25A78_486
Model release
No
Property release
No
License type
Rights managed
Available size
172,3Mb (2,9Mb) / 21,1in x 31,7in / 6336 x 9504 (300dpi)