
Caption
Recklinghausen, North Rhine-Westphalia, Germany, Renaturalised Hellbach, renaturalised watercourse, the Hellbach is now free of wastewater after the construction of a parallel sewer, is part of the Emscher river system and thus part of the Emscher conversion, was previously an open, above-ground wastewater channel, mixed water channel with surface water and wastewater. The renaturalised Hellbach stream strengthens urban climate resilience, promotes biodiversity and helps to mitigate urban warming caused by climate change, Europe
Date
Oct 10, 2023
Credit line
Photo12/imageBROKER/Rupert Oberhäuser
Reference
BRK25C72_319
Model release
NA
Property release
No
License type
Rights managed
Available size
128,1Mb (9,4Mb) / 27,3in x 18,2in / 8192 x 5464 (300dpi)