Period

770 results for: demolition work

  • Page
  • of
  • 8
Please sign in for more results
After the collapse of parts of the Carola Bridge, demolition work began on the Old Town side. The
BRK25D18_125

After the collapse of parts of the Carola Bridge, ...

After the partial collapse of the Carola Bridge, the demolition work is moved to the new side of
BRK25D12_483

After the partial collapse of the Carola Bridge, t...

After the partial collapse of the Carola Bridge, demolition work continues on a dam built directly
BRK25D14_109

After the partial collapse of the Carola Bridge, d...

After the collapse of parts of the Carola Bridge, demolition work began on the Old Town side. The
BRK25D21_361

After the collapse of parts of the Carola Bridge, ...

A section of the Carola Bridge has collapsed. Over a length of around 100 metres, the section on
BRK25D28_265

A section of the Carola Bridge has collapsed. Over...

After the partial collapse of the Carola Bridge, demolition work continues on an embankment built
BRK25D20_383

After the partial collapse of the Carola Bridge, d...

Following investigations of another reinforced concrete bridge in Saxony and the cracks caused by
BRK25D13_079

Following investigations of another reinforced con...

Partial collapse of the Carola Bridge. Over a length of around 100 metres, the section on which the
BRK25D13_168

Partial collapse of the Carola Bridge. Over a leng...

A section of the Carola Bridge has collapsed. Over a length of around 100 metres, the section on
BRK25D16_385

A section of the Carola Bridge has collapsed. Over...

After the collapse of parts of the Carola Bridge, demolition work began on the Old Town side. The
BRK25D18_255

After the collapse of parts of the Carola Bridge, ...

Detroit, Michigan, Demolition of the old headquarters of the Health Alliance Plan (HAP) insurance
BRK25D08_192

Detroit, Michigan, Demolition of the old headquart...

Detroit, Michigan, Detail of the old Packard auto plant. Designed by Albert Kahn and opened in
BRK25D10_346

Detroit, Michigan, Detail of the old Packard auto ...

Duisburg-Hochheide, large housing estate Wohnpark Hochheide, 6 20-storey high-rise buildings with
BRK25C62_400

Duisburg-Hochheide, large housing estate Wohnpark ...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25C81_231

Demolition of the old Rhine bridge Neuenkamp, the ...

Dismantling of the old motorway bridge Neuenkamp, the A40, dismantling of the last bridge pier,
BRK25C99_183

Dismantling of the old motorway bridge Neuenkamp, ...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25C99_416

Demolition of the old Rhine bridge Neuenkamp, the ...

Duisburg-Hochheide, large housing estate Wohnpark Hochheide, 6 20-storey high-rise buildings with
BRK25C63_390

Duisburg-Hochheide, large housing estate Wohnpark ...

Partial collapse of the Carola Bridge. Over a length of around 100 metres, the section on which the
BRK25C52_006

Partial collapse of the Carola Bridge. Over a leng...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25C98_393

Demolition of the old Rhine bridge Neuenkamp, the ...

Following investigations of another reinforced concrete bridge in Saxony and the cracks caused by
BRK25C51_397

Following investigations of another reinforced con...

Essen, North Rhine-Westphalia, Germany - Construction crane lifts concrete section in front of
BRK25C87_321

Essen, North Rhine-Westphalia, Germany - Construct...

Essen, North Rhine-Westphalia, Germany - Demolition of an office building, demolition of former RWE
BRK25C63_009

Essen, North Rhine-Westphalia, Germany - Demolitio...

House demolition, demolition excavator in action
BRK25C67_093

House demolition, demolition excavator in action

Construction site with high-rise building and crane, surrounded by piles of rubble, old warehouse
BRK25C70_085

Construction site with high-rise building and cran...

Essen, North Rhine-Westphalia, Germany - Construction crane lifts concrete section in front of
BRK25C86_116

Essen, North Rhine-Westphalia, Germany - Construct...

East façade during the demolition of the former Werkkunstschule, view through the gap between
BRK25C22_363

East façade during the demolition of the former We...

Krefeld, Seidenweberhaus, 1972-1976 designed by the Stappmann Thörissen Winter planning group,
BRK25C31_006

Krefeld, Seidenweberhaus, 1972-1976 designed by th...

Repowering, dismantled Enercon E-58 wind turbine in a wind farm near Issum, 9 older wind turbines
BRK25B77_438

Repowering, dismantled Enercon E-58 wind turbine i...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25B68_024

Demolished tower of a 20 year old wind turbine, in...

Dismantling of the old motorway bridge Neuenkamp, the A40, dismantling of the last bridge pier,
BRK25B86_187

Dismantling of the old motorway bridge Neuenkamp, ...

Demolition of the tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66
BRK25B86_347

Demolition of the tower of a 20 year old wind turb...

Dismantling of a wind power plant in a wind farm near Issum, 9 older wind turbines from the
BRK25B95_446

Dismantling of a wind power plant in a wind farm n...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25B95_447

Demolished tower of a 20 year old wind turbine, in...

Repowering of a wind farm near Issum, here the dismantling of the tower, 9 older wind turbines from
BRK25B95_457

Repowering of a wind farm near Issum, here the dis...

The demolition work on the Field of Mars after the Universal Exhibition of 1867, state 1869, Paris,
BRK25B55_066

The demolition work on the Field of Mars after the...

The Lufthansa high-rise (headquarters of the German airline until 2007) on the banks of the Rhine
BRK25B66_220

The Lufthansa high-rise (headquarters of the Germa...

Dismantling of the old motorway bridge Neuenkamp, the A40, dismantling of the last bridge pier,
BRK25B77_230

Dismantling of the old motorway bridge Neuenkamp, ...

Wind turbine repowering, in the Issum-Oermten wind farm, 9 wind turbines in operation for over 20
BRK25B77_425

Wind turbine repowering, in the Issum-Oermten wind...

Repowering of a wind farm near Issum, 9 older wind turbines from the manufacturer Enercon (model
BRK25B86_423

Repowering of a wind farm near Issum, 9 older wind...

Preparation for the demolition of the tower of a 20 year old wind turbine, in the Werl wind farm, 5
BRK25B95_461

Preparation for the demolition of the tower of a 2...

The Bridge of Solidarity, the longest tied-arch bridge in Germany, over the Rhine from
BRK25B96_462

The Bridge of Solidarity, the longest tied-arch br...

Demolition of the former RWE building complex, in the city centre, on the A40 motorway in Essen, in
BRK25B86_407

Demolition of the former RWE building complex, in ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25B95_396

Demolition of the old A40 Rhine bridge Neuenkamp, ...

In the early hours of the morning, a section of the Carola Bridge collapsed for unknown reasons.
BRK25B97_128

In the early hours of the morning, a section of th...

Repowering of a wind farm near Issum, 9 older wind turbines from the manufacturer Enercon (model
BRK25B77_482

Repowering of a wind farm near Issum, 9 older wind...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B88_435

Demolition of the old Rhine bridge Neuenkamp, the ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25B67_356

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Repowering, dismantled Enercon E-58 wind turbine in a wind farm near Issum, 9 older wind turbines
BRK25B67_385

Repowering, dismantled Enercon E-58 wind turbine i...

Repowering of a wind farm near Issum, here the dismantling of the tower, 9 older wind turbines from
BRK25B86_323

Repowering of a wind farm near Issum, here the dis...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B88_424

Demolition of the old Rhine bridge Neuenkamp, the ...

Erection of an Enercon E-160 wind turbine, assembly of the first blade, 4 turbines with a total
BRK25B95_472

Erection of an Enercon E-160 wind turbine, assembl...

Wind turbine repowering, in the Issum-Oermten wind farm, 9 wind turbines in operation for over 20
BRK25B95_474

Wind turbine repowering, in the Issum-Oermten wind...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B71_383

Demolition of the old Rhine bridge Neuenkamp, the ...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B79_112

Demolition of the old Rhine bridge Neuenkamp, the ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25B79_372

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Erection of an Enercon E-160 wind turbine, rear, assembly of the first blade, 4 turbines with a
BRK25B86_338

Erection of an Enercon E-160 wind turbine, rear, a...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25B95_467

Demolished tower of a 20 year old wind turbine, in...

Essen, North Rhine-Westphalia, Germany - Demolition of an office building, demolition of former RWE
BRK25B71_288

Essen, North Rhine-Westphalia, Germany - Demolitio...

Aerial view of an excavator and a lorry working on a large construction site, demolition site,
BRK25B95_322

Aerial view of an excavator and a lorry working on...

The new Rhine bridge Neuenkamp, the A40, white pillar ropes, and the old motorway bridge, which is
BRK25B19_240

The new Rhine bridge Neuenkamp, the A40, white pil...

Dismantling, demolition of the old A1 bridge near Leverkusen, noise barriers, next to it the new
BRK25B20_018

Dismantling, demolition of the old A1 bridge near ...

New construction of four Enercon E-160 turbines, repowering of a wind farm near Issum, construction
BRK25B21_098

New construction of four Enercon E-160 turbines, r...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25B21_281

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25B22_245

Demolished tower of a 20 year old wind turbine, in...

Dismantling of a wind power plant in a wind farm near Issum, 9 older wind turbines from the
BRK25B22_246

Dismantling of a wind power plant in a wind farm n...

Demolition of the tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66
BRK25B36_030

Demolition of the tower of a 20 year old wind turb...

Dismantling of the old motorway bridge Neuenkamp, the A40, dismantling of the last bridge pier,
BRK25B37_215

Dismantling of the old motorway bridge Neuenkamp, ...

In the early hours of the morning, a section of the Carola Bridge collapsed for unknown reasons.
BRK25B38_028

In the early hours of the morning, a section of th...

In the early hours of the morning, a section of the Carola Bridge collapsed for unknown reasons.
BRK25B47_001

In the early hours of the morning, a section of th...

Repowering of a wind farm near Issum, 9 older wind turbines from the manufacturer Enercon (model
BRK25B21_107

Repowering of a wind farm near Issum, 9 older wind...

The Bridge of Solidarity, the longest tied-arch bridge in Germany, over the Rhine from
BRK25B22_291

The Bridge of Solidarity, the longest tied-arch br...

Wind turbine repowering, in the Issum-Oermten wind farm, 9 wind turbines in operation for over 20
BRK25B29_134

Wind turbine repowering, in the Issum-Oermten wind...

Dismantling of a wind power plant in a wind farm near Issum, 9 older wind turbines from the
BRK25B29_153

Dismantling of a wind power plant in a wind farm n...

Dismantling of the old motorway bridge Neuenkamp, the A40, dismantling of the last bridge pier,
BRK25B37_216

Dismantling of the old motorway bridge Neuenkamp, ...

Demolition of the regatta grandstand at Lake Baldeney, in Essen, regatta tower remains standing,
BRK25B42_364

Demolition of the regatta grandstand at Lake Balde...

Erection of an Enercon E-160 wind turbine, rear, assembly of the first blade, 4 turbines with a
BRK25B10_281

Erection of an Enercon E-160 wind turbine, rear, a...

Duisburg-Hochheide, large housing estate Wohnpark Hochheide, 6 20-storey tower blocks with over
BRK25B19_495

Duisburg-Hochheide, large housing estate Wohnpark ...

Water cannon, snow cannon, sprays water onto the construction site on Haroldstraße, against dust
BRK25B22_230

Water cannon, snow cannon, sprays water onto the c...

Erection of an Enercon E-160 wind turbine, rear, assembly of the first blade, 4 turbines with a
BRK25B36_031

Erection of an Enercon E-160 wind turbine, rear, a...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25B21_280

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Demolition of the former RWE building complex, in the city centre, on the A40 motorway in Essen,
BRK25B21_285

Demolition of the former RWE building complex, in ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25B26_388

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Repowering, dismantled Enercon E-58 wind turbine in a wind farm near Issum, 9 older wind turbines
BRK25B26_456

Repowering, dismantled Enercon E-58 wind turbine i...

Construction site on Haroldstraße, demolition of a former office building, after complete gutting
BRK25B42_358

Construction site on Haroldstraße, demolition of a...

Repowering of a wind farm near Issum, here the dismantling of the tower, 9 older wind turbines from
BRK25B44_121

Repowering of a wind farm near Issum, here the dis...

Repowering of a wind farm near Issum, here the dismantling of the tower, 9 older wind turbines from
BRK25B44_122

Repowering of a wind farm near Issum, here the dis...

In the early hours of the morning, a section of the Carola Bridge collapsed for unknown reasons.
BRK25B38_027

In the early hours of the morning, a section of th...

In the early hours of the morning, a section of the Carola Bridge collapsed for unknown reasons.
BRK25B10_065

In the early hours of the morning, a section of th...

Repowering of a wind farm near Issum, here the dismantling of the tower, 9 older wind turbines from
BRK25B10_282

Repowering of a wind farm near Issum, here the dis...

Run-down country house before and after renovation construction, generative AI, AI generated
BRK25B44_081

Run-down country house before and after renovation...

Repowering of a wind farm near Issum, here the dismantling of the tower, 9 older wind turbines from
BRK25B22_244

Repowering of a wind farm near Issum, here the dis...

Erection of the tower of a wind power plant in a wind farm near Issum, 9 older wind turbines from
BRK25B29_141

Erection of the tower of a wind power plant in a w...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B41_116

Demolition of the old Rhine bridge Neuenkamp, the ...

Construction site on Haroldstraße, demolition of a former office building, after complete gutting
BRK25B09_101

Construction site on Haroldstraße, demolition of a...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B24_396

Demolition of the old Rhine bridge Neuenkamp, the ...

Erection of an Enercon E-160 wind turbine, rear, assembly of the first blade, 4 turbines with a
BRK25B29_145

Erection of an Enercon E-160 wind turbine, rear, a...

Repowering, dismantled Enercon E-58 wind turbine in a wind farm near Issum, 9 older wind turbines
BRK25B36_032

Repowering, dismantled Enercon E-58 wind turbine i...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B41_115

Demolition of the old Rhine bridge Neuenkamp, the ...

Repowering, dismantled Enercon E-58 wind turbine in a wind farm near Issum, 9 older wind turbines
BRK25B43_437

Repowering, dismantled Enercon E-58 wind turbine i...

Essen, North Rhine-Westphalia, Germany - Demolition of an office building, demolition of former RWE
BRK25B49_157

Essen, North Rhine-Westphalia, Germany - Demolitio...

  • Page
  • of
  • 8