Period

479 results for: heavy goods traffic

  • Page
  • of
  • 5
Please sign in for more results
Dismantling of the old motorway bridge Neuenkamp, the A40, dismantling of the last bridge pier,
BRK25B86_187

Dismantling of the old motorway bridge Neuenkamp, ...

Dismantling of the old motorway bridge Neuenkamp, the A40, dismantling of the last bridge pier,
BRK25B77_230

Dismantling of the old motorway bridge Neuenkamp, ...

Heavy traffic on the A2 at the Bottrop-Süd service area, overcrowded lorry parking in the evening,
BRK25B78_026

Heavy traffic on the A2 at the Bottrop-Süd service...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld-Waldbauer, with
BRK25B86_370

Transport of a 68 metre long, 22 tonne blade of a ...

Container ship 'Santa Rebecca' and cranes, Port of Rotterdam, Netherlands
BRK25B99_493

Container ship 'Santa Rebecca' and cranes, Port of...

New construction of the motorway bridge Neuenkamp of the A40, over the Rhine near Duisburg,
BRK25B67_378

New construction of the motorway bridge Neuenkamp ...

Sunset, cargo ships on the Rhine, steelworks, Hüttenwerke Krupp Mannesmann, cooling towers of the
BRK25B69_326

Sunset, cargo ships on the Rhine, steelworks, Hütt...

Strip steel coils, on freight wagons, at the ThyssenKrupp Schwelgern plant in Duisburg-Marxloh is
BRK25B78_180

Strip steel coils, on freight wagons, at the Thyss...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK25B86_361

Transport of a 68 metre long, 22 tonne blade of a ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25B95_396

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hüttenheim, 2 blast furnaces, coking plant, cargo
BRK25B68_289

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hütt...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B88_435

Demolition of the old Rhine bridge Neuenkamp, the ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25B95_463

Transport of a 68 metre long, 22 tonne blade of a ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25B67_356

Demolition of the old A40 Rhine bridge Neuenkamp, ...

A45 motorway, coming from the south, traffic is diverted in front of the Lüdenscheid junction, in
BRK25B69_363

A45 motorway, coming from the south, traffic is di...

Rhine promenade in Duisburg-Wanheim, sunset, view of the Rhine and Hüttenwerke Krupp Mannesmann,
BRK25B78_145

Rhine promenade in Duisburg-Wanheim, sunset, view ...

New construction of the Neuenkamp motorway bridge on the A40, over the Rhine near Duisburg, shortly
BRK25B78_205

New construction of the Neuenkamp motorway bridge ...

New construction of the motorway bridge Neuenkamp of the A40, over the Rhine near Duisburg, evening
BRK25B87_042

New construction of the motorway bridge Neuenkamp ...

A45 motorway, the Rahmede viaduct, which is totally closed due to massive damage to the supporting
BRK25B96_374

A45 motorway, the Rahmede viaduct, which is totall...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25B86_340

Transport of a 68 metre long, 22 tonne blade of a ...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B88_424

Demolition of the old Rhine bridge Neuenkamp, the ...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B95_453

Preparation for the transport of a 68 metre long b...

Heavy traffic at the Herne motorway junction, A42 and A43, major roadworks, many lorries, narrow,
BRK25B96_116

Heavy traffic at the Herne motorway junction, A42 ...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B68_028

Preparation for the transport of a 68 metre long b...

New construction of the motorway bridge Neuenkamp of the A40, over the Rhine near Duisburg,
BRK25B69_189

New construction of the motorway bridge Neuenkamp ...

New construction of the A1 motorway bridge over the Rhine near Leverkusen, after completion of the
BRK25B69_190

New construction of the A1 motorway bridge over th...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B71_383

Demolition of the old Rhine bridge Neuenkamp, the ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK25B77_463

Transport of a 68 metre long, 22 tonne blade of a ...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B79_112

Demolition of the old Rhine bridge Neuenkamp, the ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25B79_372

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25B86_341

Transport of a 68 metre long, 22 tonne blade of a ...

Motorway bridge of the A42 motorway, Emscher expressway, over the Rhine-Herne Canal heavy goods
BRK25B96_117

Motorway bridge of the A42 motorway, Emscher expre...

Duisburg, North Rhine-Westphalia, Germany - Cityscape in the Ruhr area with cargo ship on the Rhine
BRK25B72_431

Duisburg, North Rhine-Westphalia, Germany - Citysc...

Duisburg, North Rhine-Westphalia, Germany, freighter at the southern harbour, Holcim cement works
BRK25B78_279

Duisburg, North Rhine-Westphalia, Germany, freight...

Duisburg, North Rhine-Westphalia, Germany, freighter at the southern harbour, Holcim cement works
BRK25B90_207

Duisburg, North Rhine-Westphalia, Germany, freight...

The new Rhine bridge Neuenkamp, the A40, white pillar ropes, and the old motorway bridge, which is
BRK25B19_240

The new Rhine bridge Neuenkamp, the A40, white pil...

Dismantling, demolition of the old A1 bridge near Leverkusen, noise barriers, next to it the new
BRK25B20_018

Dismantling, demolition of the old A1 bridge near ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25B21_281

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B22_249

Preparation for the transport of a 68 metre long b...

Motorway bridge of the A42 motorway, Emscher expressway, over the Rhine-Herne Canal heavy goods
BRK25B26_302

Motorway bridge of the A42 motorway, Emscher expre...

Weighing and barrier system on the A42 motorway, in front of the dilapidated motorway bridge over
BRK25B26_445

Weighing and barrier system on the A42 motorway, i...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B29_150

Preparation for the transport of a 68 metre long b...

Sunset, cargo ships on the Rhine, steelworks, Hüttenwerke Krupp Mannesmann, discharge cloud of the
BRK25B35_121

Sunset, cargo ships on the Rhine, steelworks, Hütt...

The Berlin Bridge, motorway A59, over the Duisburg port area, 1.8 km long, has a remaining useful
BRK25B36_248

The Berlin Bridge, motorway A59, over the Duisburg...

Dismantling of the old motorway bridge Neuenkamp, the A40, dismantling of the last bridge pier,
BRK25B37_215

Dismantling of the old motorway bridge Neuenkamp, ...

A42 motorway bridge, over the Rhine-Herne Canal, with massive structural damage, totally closed for
BRK25B43_385

A42 motorway bridge, over the Rhine-Herne Canal, w...

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hüttenheim, 2 blast furnaces, coking plant, quenching
BRK25B21_336

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hütt...

Freighter, dilapidated motorway bridge A42, (red arches) over the Rhine-Herne Canal, with massive
BRK25B26_306

Freighter, dilapidated motorway bridge A42, (red a...

Dismantling of the old motorway bridge Neuenkamp, the A40, dismantling of the last bridge pier,
BRK25B37_216

Dismantling of the old motorway bridge Neuenkamp, ...

The Berlin Bridge, motorway A59, over the Duisburg port area, 1.8 km long, has a remaining useful
BRK25B00_486

The Berlin Bridge, motorway A59, over the Duisburg...

Blast furnace Schwelgern 1 and 2, strip steel rolls, coils, on freight wagons, at the ThyssenKrupp
BRK25B35_124

Blast furnace Schwelgern 1 and 2, strip steel roll...

New construction of the Neuenkamp motorway bridge on the A40, over the Rhine near Duisburg,
BRK25B35_174

New construction of the Neuenkamp motorway bridge ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK25B09_104

Transport of a 68 metre long, 22 tonne blade of a ...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B09_108

Preparation for the transport of a 68 metre long b...

Motorway bridge of the A42 motorway, Emscher expressway, over the Rhine-Herne Canal heavy goods
BRK25B09_137

Motorway bridge of the A42 motorway, Emscher expre...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, onlookers, with a
BRK25B29_139

Transport of a 68 metre long, 22 tonne blade of a ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld-Waldbauer, with
BRK25B36_034

Transport of a 68 metre long, 22 tonne blade of a ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25B36_049

Transport of a 68 metre long, 22 tonne blade of a ...

Heavy traffic on the A2 motorway at the Recklinghausen junction heading west, in the background the
BRK25B42_432

Heavy traffic on the A2 motorway at the Recklingha...

Rhine promenade in Duisburg-Wanheim, sunset, view of the Rhine and Hüttenwerke Krupp Mannesmann,
BRK25B19_492

Rhine promenade in Duisburg-Wanheim, sunset, view ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25B21_280

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25B26_388

Demolition of the old A40 Rhine bridge Neuenkamp, ...

New construction of the motorway bridge Neuenkamp of the A40, over the Rhine near Duisburg, evening
BRK25B35_145

New construction of the motorway bridge Neuenkamp ...

A42 motorway bridge, over the Rhine-Herne Canal, with massive structural damage, technician
BRK25B36_157

A42 motorway bridge, over the Rhine-Herne Canal, w...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25B43_432

Transport of a 68 metre long, 22 tonne blade of a ...

The STEAG cogeneration plant Duisburg-Walsum, cooling tower, next to Logport VI, logistics area for
BRK25B01_238

The STEAG cogeneration plant Duisburg-Walsum, cool...

Motorway A45, the Rahmede viaduct, which is totally closed due to massive damage to the supporting
BRK25B21_177

Motorway A45, the Rahmede viaduct, which is totall...

New construction of the motorway bridge Neuenkamp of the A40, over the Rhine near Duisburg,
BRK25B21_296

New construction of the motorway bridge Neuenkamp ...

Dilapidated A42 motorway bridge (red arches) over the Rhine-Herne Canal, with massive structural
BRK25B21_298

Dilapidated A42 motorway bridge (red arches) over ...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B41_116

Demolition of the old Rhine bridge Neuenkamp, the ...

New construction of the A1 motorway bridge over the Rhine near Leverkusen, after completion of the
BRK25B42_379

New construction of the A1 motorway bridge over th...

Winter weather, heavy snowfall, city centre traffic, postman with bicycle in the snow, Essen, North
BRK25B09_270

Winter weather, heavy snowfall, city centre traffi...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B21_057

Preparation for the transport of a 68 metre long b...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B24_396

Demolition of the old Rhine bridge Neuenkamp, the ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, onlookers, with a
BRK25B36_048

Transport of a 68 metre long, 22 tonne blade of a ...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B41_115

Demolition of the old Rhine bridge Neuenkamp, the ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK25B43_435

Transport of a 68 metre long, 22 tonne blade of a ...

Cargo ship 'Panamax Giant' in shipyard at Botlek, Port of Rotterdam, Netherlands
BRK25B45_174

Cargo ship 'Panamax Giant' in shipyard at Botlek, ...

Cargo ship, heavy goods transporter, Bravewind sails in winter in the Kiel Canal, NOK, Kiel Canal,
BRK25B33_360

Cargo ship, heavy goods transporter, Bravewind sai...

Duisburg, North Rhine-Westphalia, Germany, freighter at the southern harbour, Holcim cement works
BRK25B46_092

Duisburg, North Rhine-Westphalia, Germany, freight...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25A99_481

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25A52_142

Preparation for the transport of a 68 metre long b...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25A52_146

Transport of a 68 metre long, 22 tonne blade of a ...

Cargo ship 'Ilka' moored by Euromast tower, Port of Rotterdam, Netherlands
BRK25A66_079

Cargo ship 'Ilka' moored by Euromast tower, Port o...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25A75_353

Transport of a 68 metre long, 22 tonne blade of a ...

New construction of the motorway bridge Neuenkamp of the A40, over the Rhine near Duisburg,
BRK25A52_280

New construction of the motorway bridge Neuenkamp ...

New construction of the motorway bridge Neuenkamp of the A40, over the Rhine near Duisburg, evening
BRK25A61_210

New construction of the motorway bridge Neuenkamp ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25A65_003

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Bridge piers of the old and the first part of the two new bridges of the A40 motorway over the
BRK25A75_249

Bridge piers of the old and the first part of the ...

The new Rhine bridge Neuenkamp, the A40, white pillar ropes, and the old motorway bridge, which is
BRK25A81_049

The new Rhine bridge Neuenkamp, the A40, white pil...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25A81_321

Demolition of the old A40 Rhine bridge Neuenkamp, ...

A45 motorway, coming from the south, traffic is diverted in front of the Lüdenscheid junction, in
BRK25A52_247

A45 motorway, coming from the south, traffic is di...

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hüttenheim, 2 blast furnaces, coking plant, cargo
BRK25A66_269

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hütt...

Dismantling of the old motorway bridge Neuenkamp, the A40, dismantling of the last bridge pier,
BRK25A72_273

Dismantling of the old motorway bridge Neuenkamp, ...

City centre traffic, lorry driving through the town of Breckerfeld, narrow passage in Frankfurter
BRK25A52_333

City centre traffic, lorry driving through the tow...

A45 motorway, the Rahmede viaduct, which is totally closed due to massive damage to the supporting
BRK25A75_310

A45 motorway, the Rahmede viaduct, which is totall...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld-Waldbauer, with
BRK25A59_270

Transport of a 68 metre long, 22 tonne blade of a ...

The Berlin Bridge, motorway A59, over the Duisburg port area, 1.8 km long, has a remaining useful
BRK25A54_130

The Berlin Bridge, motorway A59, over the Duisburg...

The Berlin Bridge, motorway A59, over the Duisburg port area, 1.8 km long, has a remaining useful
BRK25A73_457

The Berlin Bridge, motorway A59, over the Duisburg...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25A75_342

Demolition of the old A40 Rhine bridge Neuenkamp, ...

  • Page
  • of
  • 5