Period

985 results for: renovation of old buildings

  • Page
  • of
  • 10
Please sign in for more results
Red brick Victoria buildings clocktower and renovation of art gallery, Central Campus, University
BRK25D82_171

Red brick Victoria buildings clocktower and renova...

Albertinum Sculpture Hall
BRK25D98_353

Albertinum Sculpture Hall

Old building, renovation, scaffolding, Kurfürstendamm, Charlottenburg, Berlin, Germany, Europe
BRK25D51_230

Old building, renovation, scaffolding, Kurfürstend...

Facade decoration on a Wilhelminian style house for renovation, branches with cherries, detail,
BRK25D88_268

Facade decoration on a Wilhelminian style house fo...

New whisper asphalt surface for the A40 motorway, in the city of Essen, direction Dortmund, 95, 000
BRK25D89_452

New whisper asphalt surface for the A40 motorway, ...

Albertinum
BRK25D99_246

Albertinum

New whisper asphalt surface for the A40 motorway, in the city of Essen, direction Dortmund, 95, 000
BRK25D92_483

New whisper asphalt surface for the A40 motorway, ...

Facade of an old closed hotel, Goerlitzer Hof, in need of renovation, GDR architecture, city
BRK25D81_094

Facade of an old closed hotel, Goerlitzer Hof, in ...

After the partial collapse of the Carola Bridge. The embankment on the old town side of the Elbe is
BRK25D23_271

After the partial collapse of the Carola Bridge. T...

Dorfkrug Country Inn
BRK25D34_276

Dorfkrug Country Inn

After the collapse of parts of the Carola Bridge, demolition work began on the Old Town side. The
BRK25D18_125

After the collapse of parts of the Carola Bridge, ...

Barrier tape with the the word
BRK25D46_369

Barrier tape with the the word

Bahla, Hisn Tamah Fortress, Hisn Tamah Fortress, probably built in the 17th century by the Nabhani
BRK25D10_099

Bahla, Hisn Tamah Fortress, Hisn Tamah Fortress, p...

After the partial collapse of the Carola Bridge, the demolition work is moved to the new side of
BRK25D12_483

After the partial collapse of the Carola Bridge, t...

After the collapse of parts of the Carola Bridge, demolition work began on the Old Town side. The
BRK25D21_361

After the collapse of parts of the Carola Bridge, ...

After the collapse of parts of the Carola Bridge, demolition work began on the Old Town side. The
BRK25D18_255

After the collapse of parts of the Carola Bridge, ...

Detroit, Michigan, Demolition of the old headquarters of the Health Alliance Plan (HAP) insurance
BRK25D08_192

Detroit, Michigan, Demolition of the old headquart...

Opened yellow wooden counter culler against a white background
BRK25D11_404

Opened yellow wooden counter culler against a whit...

Germany, Berlin, 28.12.2024, Ringbahn trench of the S-Bahn, rear building gable Kopenhagener
BRK25D15_426

Germany, Berlin, 28.12.2024, Ringbahn trench of th...

Duisburg-Hochheide, large housing estate Wohnpark Hochheide, 6 20-storey high-rise buildings with
BRK25C62_400

Duisburg-Hochheide, large housing estate Wohnpark ...

Victoria building clocktower renovation of art gallery, University of Liverpool, England, UK - red
BRK25C78_061

Victoria building clocktower renovation of art gal...

Red brick Victoria building clocktower and renovation of art gallery, Sir Peter Rigby Centre,
BRK25C74_304

Red brick Victoria building clocktower and renovat...

Duisburg-Hochheide, large housing estate Wohnpark Hochheide, 6 20-storey high-rise buildings with
BRK25C63_390

Duisburg-Hochheide, large housing estate Wohnpark ...

Hamburg, Germany - Speicherstadt, construction work in the canal, renovation of the water channel
BRK25C70_451

Hamburg, Germany - Speicherstadt, construction wor...

Facade of an old closed shop, in need of renovation, GDR architecture, city centre, Goerlitz, Free
BRK25C66_486

Facade of an old closed shop, in need of renovatio...

Hamburg, Germany - Speicherstadt, construction work in the canal, renovation of the water channel,
BRK25C95_476

Hamburg, Germany - Speicherstadt, construction wor...

Old unrenovated wooden half-timbered house in Neugersdorf, Oberlausitzer Bergland, Saxony, Germany,
BRK25C93_413

Old unrenovated wooden half-timbered house in Neug...

Former entrance to the department stores', old building on Zollstraße, still with Konsum logo,
BRK25C90_254

Former entrance to the department stores', old bui...

Half-timbered houses in Neugersdorf, Oberlausitzer Bergland, Saxony, Germany, Europe
BRK25C70_433

Half-timbered houses in Neugersdorf, Oberlausitzer...

Scaffolded high-rise building from the 1970s, refurbishment in the Hochheide residential park,
BRK25C84_252

Scaffolded high-rise building from the 1970s, refu...

ABP From Port to Places redevelopment project, Grimsby docks, north east Lincolnshire, England, UK
BRK25C37_140

ABP From Port to Places redevelopment project, Gri...

ABP From Port to Places redevelopment project, Grimsby docks, north east Lincolnshire, England, UK
BRK25C37_271

ABP From Port to Places redevelopment project, Gri...

Renovation work in the bathroom, Germany, Europe
BRK25C16_110

Renovation work in the bathroom, Germany, Europe

Conservation work sign banner, derelict empty disused property in Grimsby docks, north east
BRK25C37_275

Conservation work sign banner, derelict empty disu...

ABP Putting the Great Back into Grimsby redevelopment project, Grimsby docks, north east
BRK25C37_229

ABP Putting the Great Back into Grimsby redevelopm...

ABP Putting the Great Back into Grimsby redevelopment project, Grimsby docks, north east
BRK25C37_097

ABP Putting the Great Back into Grimsby redevelopm...

Derelict empty boarded-up house next to renovated house, Willingham Terrace, Grimsby, north east
BRK25C37_102

Derelict empty boarded-up house next to renovated ...

ABP Putting the Great Back into Grimsby redevelopment project, Grimsby docks, north east
BRK25C37_169

ABP Putting the Great Back into Grimsby redevelopm...

Renovation work in the bathroom, Germany, Europe
BRK25C15_242

Renovation work in the bathroom, Germany, Europe

Albertinum
BRK25B56_466

Albertinum

Albertinum
BRK25B59_477

Albertinum

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25B68_024

Demolished tower of a 20 year old wind turbine, in...

Renewal of the road surface on the A40 motorway between the Kaiserberg junction and Mülheim-Heißen,
BRK25B77_498

Renewal of the road surface on the A40 motorway be...

Marking work after the renewal of the road surface on the A40 motorway between the Kaiserberg
BRK25B78_020

Marking work after the renewal of the road surface...

Demolition of the tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66
BRK25B86_347

Demolition of the tower of a 20 year old wind turb...

Energy-efficient refurbishment of an apartment block, thermal insulation, new windows and new roof
BRK25B86_389

Energy-efficient refurbishment of an apartment blo...

Marking work after the renewal of the road surface on the A40 motorway between the Kaiserberg
BRK25B86_421

Marking work after the renewal of the road surface...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25B95_447

Demolished tower of a 20 year old wind turbine, in...

Renewal of the road surface on the A40 motorway between the Kaiserberg junction and Mülheim-Heißen,
BRK25B96_129

Renewal of the road surface on the A40 motorway be...

Preparation for the demolition of the tower of a 20 year old wind turbine, in the Werl wind farm, 5
BRK25B95_461

Preparation for the demolition of the tower of a 2...

Saxon State Parliament
BRK25B57_030

Saxon State Parliament

Albertinum
BRK25B59_479

Albertinum

Duisport, Ruhrort harbour, coal island, conversion of the old port area into Europe's largest
BRK25B78_201

Duisport, Ruhrort harbour, coal island, conversion...

Marking work after the application of new whisper asphalt surface for the A40 motorway, in the
BRK25B79_046

Marking work after the application of new whisper ...

Renewal of the road surface on the A40 motorway between the Kaiserberg junction and Mülheim-Heißen,
BRK25B86_387

Renewal of the road surface on the A40 motorway be...

Old cotton
BRK25B62_075

Old cotton

The Open Monument Day on 10.09.2017 in Iserlohn. Monument Altstadt 52 under renovation, Germany,
BRK25B59_241

The Open Monument Day on 10.09.2017 in Iserlohn. M...

Renewal of the road surface on the A40 motorway between the Kaiserberg junction and Mülheim-Heißen,
BRK25B78_045

Renewal of the road surface on the A40 motorway be...

Saxon Railway Museum Chemnitz, steam locomotive 38205
BRK25B57_033

Saxon Railway Museum Chemnitz, steam locomotive 38...

Renewal of the road surface on the A40 motorway between the Kaiserberg junction and Mülheim-Heißen,
BRK25B69_187

Renewal of the road surface on the A40 motorway be...

Renewal of the road surface on the A40 motorway between the Kaiserberg junction and Mülheim-Heißen,
BRK25B96_118

Renewal of the road surface on the A40 motorway be...

In the early hours of the morning, a section of the Carola Bridge collapsed for unknown reasons.
BRK25B69_007

In the early hours of the morning, a section of th...

New construction of the A1 motorway bridge over the Rhine near Leverkusen, after completion of the
BRK25B69_190

New construction of the A1 motorway bridge over th...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25B95_467

Demolished tower of a 20 year old wind turbine, in...

Partial collapse of the Carola Bridge in Dresden with the Church of Our Lady and Semperoper in the
BRK25B66_050

Partial collapse of the Carola Bridge in Dresden w...

Partial collapse of the Carola Bridge in Dresden, 11/09/2024
BRK25B92_037

Partial collapse of the Carola Bridge in Dresden, ...

Old historic half-timbered house, windows, shutters, façade, in need of renovation, Swabian Alb,
BRK25B81_246

Old historic half-timbered house, windows, shutter...

Dismantling, demolition of the old A1 bridge near Leverkusen, noise barriers, next to it the new
BRK25B20_018

Dismantling, demolition of the old A1 bridge near ...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK25B22_245

Demolished tower of a 20 year old wind turbine, in...

Marking work after the renewal of the road surface on the A40 motorway between the Kaiserberg
BRK25B26_282

Marking work after the renewal of the road surface...

Modernisation of Duisburg Central Station, the platforms of the 13 tracks are being renewed, the
BRK25B26_427

Modernisation of Duisburg Central Station, the pla...

Weighing and barrier system on the A42 motorway, in front of the dilapidated motorway bridge over
BRK25B26_445

Weighing and barrier system on the A42 motorway, i...

Demolition of the tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66
BRK25B36_030

Demolition of the tower of a 20 year old wind turb...

Marking work after the renewal of the road surface on the A40 motorway between the Kaiserberg
BRK25B36_177

Marking work after the renewal of the road surface...

Old cotton
BRK25B17_353

Old cotton

Renewal of the road surface on the A40 motorway between the Kaiserberg junction and Mülheim-Heißen,
BRK25B21_286

Renewal of the road surface on the A40 motorway be...

Motorway construction site on the A52 in Essen Basic refurbishment of the motorway, new noise
BRK25B42_408

Motorway construction site on the A52 in Essen Bas...

Old cotton
BRK25B17_354

Old cotton

Track from textured brown sandstone, Background
BRK25B43_171

Track from textured brown sandstone, Background

Duisburg-Hochheide, large housing estate Wohnpark Hochheide, 6 20-storey tower blocks with over
BRK25B19_495

Duisburg-Hochheide, large housing estate Wohnpark ...

Lost Place, old cowshed, Collm, Wermsdorf, Saxony, Germany, Europe
BRK25B29_396

Lost Place, old cowshed, Collm, Wermsdorf, Saxony,...

Marking work after the application of new whisper asphalt surface for the A40 motorway, in the
BRK25B03_265

Marking work after the application of new whisper ...

New whisper asphalt surface for the A40 motorway, in the city of Essen, direction Dortmund, 95, 000
BRK25B05_324

New whisper asphalt surface for the A40 motorway, ...

Albertinum
BRK25B15_024

Albertinum

Duisburg-Hochheide, large housing estate Wohnpark Hochheide, 6 20-storey high-rise buildings with
BRK25B21_221

Duisburg-Hochheide, large housing estate Wohnpark ...

Renewal of the road surface on the A40 motorway between the Kaiserberg junction and Mülheim-Heißen,
BRK25B21_290

Renewal of the road surface on the A40 motorway be...

Renewal of the road surface on the A40 motorway between the Kaiserberg junction and Mülheim-Heißen,
BRK25B26_272

Renewal of the road surface on the A40 motorway be...

Town Hall municipal building boarded up for redevelopment, Lowestoft, Suffolk, England, UK
BRK25B29_240

Town Hall municipal building boarded up for redeve...

Renewal of the road surface on the A40 motorway between the Kaiserberg junction and Mülheim-Heißen,
BRK25B42_407

Renewal of the road surface on the A40 motorway be...

The two divisions, Urban Development, Construction, Transport and Real Estate and Environment and
BRK25B00_250

The two divisions, Urban Development, Construction...

The Open Monument Day on 10.09.2017 in Iserlohn. Monument Altstadt 52 under renovation, Germany,
BRK25B14_247

The Open Monument Day on 10.09.2017 in Iserlohn. M...

Renewal of the road surface on the A40 motorway between the Kaiserberg junction and Mülheim-Heißen,
BRK25B36_169

Renewal of the road surface on the A40 motorway be...

Saxon Railway Museum Chemnitz, steam locomotive 58261
BRK25B13_022

Saxon Railway Museum Chemnitz, steam locomotive 58...

Contractor facing before and after interior of house wood construction framing and finished build
BRK25B14_364

Contractor facing before and after interior of hou...

Renewal of the road surface on the A40 motorway between the Kaiserberg junction and Mülheim-Heißen,
BRK25B21_288

Renewal of the road surface on the A40 motorway be...

Marking work after the renewal of the road surface on the A40 motorway between the Kaiserberg
BRK25B21_289

Marking work after the renewal of the road surface...

Energy-efficient refurbishment of an apartment block, thermal insulation, new windows and new roof
BRK25B26_304

Energy-efficient refurbishment of an apartment blo...

New whisper asphalt surface for the A40 motorway, in the city of Essen, direction Dortmund, 95, 000
BRK25B30_017

New whisper asphalt surface for the A40 motorway, ...

Energy-efficient refurbishment of an apartment block, thermal insulation, new windows and new roof
BRK25B36_127

Energy-efficient refurbishment of an apartment blo...

Renewal of the road surface on the A40 motorway between the Kaiserberg junction and Mülheim-Heißen,
BRK25B36_140

Renewal of the road surface on the A40 motorway be...

  • Page
  • of
  • 10