Période

1152 résultats pour : heavy traffic

  • Page
  • sur
  • 12
Connectez-vous pour plus de résultats
Motorway A3 between Düsseldorf and Leverkusen, near Erkrath, rush hour, heavy traffic
BRK25B53_062

Motorway A3 between Düsseldorf and Leverkusen, nea...

Central cycle path on the Lange Viestraat, in the centre of Utrecht, lanes for pedestrians,
BRK25B86_453

Central cycle path on the Lange Viestraat, in the ...

Winter weather, heavy snowfall, city centre traffic, passers-by in the snow, North
BRK25B72_290

Winter weather, heavy snowfall, city centre traffi...

Wind farm under construction, on Maasvlakte 2, new part of the port of Rotterdam, 22 onshore wind
BRK25B77_467

Wind farm under construction, on Maasvlakte 2, new...

Dismantling of the old motorway bridge Neuenkamp, the A40, dismantling of the last bridge pier,
BRK25B86_187

Dismantling of the old motorway bridge Neuenkamp, ...

Central cycle path on the Lange Viestraat, in the centre of Utrecht, lanes for pedestrians,
BRK25B96_137

Central cycle path on the Lange Viestraat, in the ...

The A3 motorway, heavy traffic on 8 lanes, including the temporarily open hard shoulder, in front
BRK25B96_148

The A3 motorway, heavy traffic on 8 lanes, includi...

Motorway A3 between Düsseldorf and Leverkusen, near Erkrath, video cameras monitor the traffic,
BRK25B60_467

Motorway A3 between Düsseldorf and Leverkusen, nea...

Dismantling of the old motorway bridge Neuenkamp, the A40, dismantling of the last bridge pier,
BRK25B77_230

Dismantling of the old motorway bridge Neuenkamp, ...

Heavy traffic on the A2 at the Bottrop-Süd service area, overcrowded lorry parking in the evening,
BRK25B78_026

Heavy traffic on the A2 at the Bottrop-Süd service...

High water on the Ruhr, after long heavy rainfall the river came out of its bed and flooded the
BRK25B78_133

High water on the Ruhr, after long heavy rainfall ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld-Waldbauer, with
BRK25B86_370

Transport of a 68 metre long, 22 tonne blade of a ...

Winter weather, heavy snowfall, railway tracks in front of Essen main station, S-Bahn train, North
BRK25B88_090

Winter weather, heavy snowfall, railway tracks in ...

Winter weather, heavy snowfall, city centre traffic, passers-by in the snow, Essen, North
BRK25B97_006

Winter weather, heavy snowfall, city centre traffi...

A57 motorway near Kaarst in the Rhine district of Neuss, view in the direction of the Kaarst
BRK25B97_424

A57 motorway near Kaarst in the Rhine district of ...

Container ship 'Santa Rebecca' and cranes, Port of Rotterdam, Netherlands
BRK25B99_493

Container ship 'Santa Rebecca' and cranes, Port of...

New construction of the motorway bridge Neuenkamp of the A40, over the Rhine near Duisburg,
BRK25B67_378

New construction of the motorway bridge Neuenkamp ...

Sunset, cargo ships on the Rhine, steelworks, Hüttenwerke Krupp Mannesmann, cooling towers of the
BRK25B69_326

Sunset, cargo ships on the Rhine, steelworks, Hütt...

Skyline of the steel location Duisburg, Thyssenkrupp Steel Europe, in Duisburg-Bruckhausen, sunset,
BRK25B78_154

Skyline of the steel location Duisburg, Thyssenkru...

Strip steel coils, on freight wagons, at the ThyssenKrupp Schwelgern plant in Duisburg-Marxloh is
BRK25B78_180

Strip steel coils, on freight wagons, at the Thyss...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK25B86_361

Transport of a 68 metre long, 22 tonne blade of a ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25B95_396

Demolition of the old A40 Rhine bridge Neuenkamp, ...

In the early hours of the morning, a section of the Carola Bridge collapsed for unknown reasons.
BRK25B97_128

In the early hours of the morning, a section of th...

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hüttenheim, 2 blast furnaces, coking plant, cargo
BRK25B68_289

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hütt...

Central cycle path on the Vredenburgviaduct, at the Hoog Catharijne shopping centre, behind Utrecht
BRK25B69_194

Central cycle path on the Vredenburgviaduct, at th...

High water on the Ruhr, after long heavy rainfall the river left its bed and flooded the
BRK25B78_132

High water on the Ruhr, after long heavy rainfall ...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B88_435

Demolition of the old Rhine bridge Neuenkamp, the ...

Winter weather, heavy snowfall, city centre traffic, emergency doctor vehicle of the Essen fire
BRK25B90_080

Winter weather, heavy snowfall, city centre traffi...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25B95_463

Transport of a 68 metre long, 22 tonne blade of a ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25B67_356

Demolition of the old A40 Rhine bridge Neuenkamp, ...

A45 motorway, coming from the south, traffic is diverted in front of the Lüdenscheid junction, in
BRK25B69_363

A45 motorway, coming from the south, traffic is di...

Motorway A40, Ruhrschnellweg, near Bochum, heavy evening traffic, in front of the motorway junction
BRK25B77_483

Motorway A40, Ruhrschnellweg, near Bochum, heavy e...

Central cycle path on the Vredenburgviaduct, at the Hoog Catharijne shopping centre, behind Utrecht
BRK25B78_034

Central cycle path on the Vredenburgviaduct, at th...

Rhine promenade in Duisburg-Wanheim, sunset, view of the Rhine and Hüttenwerke Krupp Mannesmann,
BRK25B78_145

Rhine promenade in Duisburg-Wanheim, sunset, view ...

New construction of the Neuenkamp motorway bridge on the A40, over the Rhine near Duisburg, shortly
BRK25B78_205

New construction of the Neuenkamp motorway bridge ...

New construction of the motorway bridge Neuenkamp of the A40, over the Rhine near Duisburg, evening
BRK25B87_042

New construction of the motorway bridge Neuenkamp ...

Urban greening, inner-city street Laan op Zuid, in Rotterdam's Feijenoord district, 4 lanes, 2 tram
BRK25B87_137

Urban greening, inner-city street Laan op Zuid, in...

Urban greening, inner-city street Laan op Zuid, in Rotterdam's Feijenoord district, 4 lanes, 2 tram
BRK25B96_110

Urban greening, inner-city street Laan op Zuid, in...

A45 motorway, the Rahmede viaduct, which is totally closed due to massive damage to the supporting
BRK25B96_374

A45 motorway, the Rahmede viaduct, which is totall...

Winter, rainy weather, freezing rain, large puddle, puddle of water, in the city centre, Große
BRK25B78_041

Winter, rainy weather, freezing rain, large puddle...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25B86_340

Transport of a 68 metre long, 22 tonne blade of a ...

Winter, rainy weather, freezing rain, large puddle, puddle of water, in the city centre, Große
BRK25B86_380

Winter, rainy weather, freezing rain, large puddle...

The A3 motorway, heavy traffic on 8 lanes, including the temporarily open hard shoulder, in front
BRK25B86_438

The A3 motorway, heavy traffic on 8 lanes, includi...

Central cycle path on Smakkelaarskade, at Utrecht Centraall station, in the centre of Utrecht,
BRK25B86_452

Central cycle path on Smakkelaarskade, at Utrecht ...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B88_424

Demolition of the old Rhine bridge Neuenkamp, the ...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B95_453

Preparation for the transport of a 68 metre long b...

Heavy traffic at the Herne motorway junction, A42 and A43, major roadworks, many lorries, narrow,
BRK25B96_116

Heavy traffic at the Herne motorway junction, A42 ...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B68_028

Preparation for the transport of a 68 metre long b...

New construction of the motorway bridge Neuenkamp of the A40, over the Rhine near Duisburg,
BRK25B69_189

New construction of the motorway bridge Neuenkamp ...

New construction of the A1 motorway bridge over the Rhine near Leverkusen, after completion of the
BRK25B69_190

New construction of the A1 motorway bridge over th...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B71_383

Demolition of the old Rhine bridge Neuenkamp, the ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK25B77_463

Transport of a 68 metre long, 22 tonne blade of a ...

Demolition of the old Rhine bridge Neuenkamp, the A40, behind the first of 2 new bridges, which is
BRK25B79_112

Demolition of the old Rhine bridge Neuenkamp, the ...

The headquarters of thyssenkrupp Steel Europe AG in Duisburg-Bruckhausen, Kaiser-Wilhelm-Straße,
BRK25B79_369

The headquarters of thyssenkrupp Steel Europe AG i...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25B79_372

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25B86_341

Transport of a 68 metre long, 22 tonne blade of a ...

Duisburg-Bruckhausen steel site, ThyssenKrupp Steel, blast furnaces 8 and 9, on
BRK25B87_151

Duisburg-Bruckhausen steel site, ThyssenKrupp Stee...

Motorway bridge of the A42 motorway, Emscher expressway, over the Rhine-Herne Canal heavy goods
BRK25B96_117

Motorway bridge of the A42 motorway, Emscher expre...

Duisburg, North Rhine-Westphalia, Germany - Cityscape in the Ruhr area with cargo ship on the Rhine
BRK25B72_431

Duisburg, North Rhine-Westphalia, Germany - Citysc...

Driving in heavy traffic and rain at dusk, Witten, North Rhine-Westphalia, Germany, Europe
BRK25B84_255

Driving in heavy traffic and rain at dusk, Witten,...

Duisburg, North Rhine-Westphalia, Germany, freighter at the southern harbour, Holcim cement works
BRK25B78_279

Duisburg, North Rhine-Westphalia, Germany, freight...

Duisburg, North Rhine-Westphalia, Germany, freighter at the southern harbour, Holcim cement works
BRK25B90_207

Duisburg, North Rhine-Westphalia, Germany, freight...

Drivers jam up on Potsdamer Strasse in heavy rain. After weeks of heat, the first heavy rain and
BRK25B81_368

Drivers jam up on Potsdamer Strasse in heavy rain....

The new Rhine bridge Neuenkamp, the A40, white pillar ropes, and the old motorway bridge, which is
BRK25B19_240

The new Rhine bridge Neuenkamp, the A40, white pil...

Dismantling, demolition of the old A1 bridge near Leverkusen, noise barriers, next to it the new
BRK25B20_018

Dismantling, demolition of the old A1 bridge near ...

Demolition of the old A40 Rhine bridge Neuenkamp, next to it the first part of the new motorway
BRK25B21_281

Demolition of the old A40 Rhine bridge Neuenkamp, ...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B22_249

Preparation for the transport of a 68 metre long b...

Motorway bridge of the A42 motorway, Emscher expressway, over the Rhine-Herne Canal heavy goods
BRK25B26_302

Motorway bridge of the A42 motorway, Emscher expre...

Duisburg-Bruckhausen steel site, ThyssenKrupp Steel, blast furnaces 8 and 9, on
BRK25B26_390

Duisburg-Bruckhausen steel site, ThyssenKrupp Stee...

Weighing and barrier system on the A42 motorway, in front of the dilapidated motorway bridge over
BRK25B26_445

Weighing and barrier system on the A42 motorway, i...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B29_150

Preparation for the transport of a 68 metre long b...

Sunset, cargo ships on the Rhine, steelworks, Hüttenwerke Krupp Mannesmann, discharge cloud of the
BRK25B35_121

Sunset, cargo ships on the Rhine, steelworks, Hütt...

Skyline of the Duisburg steel site, Thyssenkrupp Steel Europe, in Duisburg-Bruckhausen, sunset,
BRK25B35_183

Skyline of the Duisburg steel site, Thyssenkrupp S...

City centre traffic, 3-lane Westfalendamm, federal road B1, heavy traffic, tram line runs parallel,
BRK25B36_117

City centre traffic, 3-lane Westfalendamm, federal...

The Berlin Bridge, motorway A59, over the Duisburg port area, 1.8 km long, has a remaining useful
BRK25B36_248

The Berlin Bridge, motorway A59, over the Duisburg...

Dismantling of the old motorway bridge Neuenkamp, the A40, dismantling of the last bridge pier,
BRK25B37_215

Dismantling of the old motorway bridge Neuenkamp, ...

City centre traffic, 3-lane Westfalendamm, federal road B1, heavy traffic, North Rhine-Westphalia,
BRK25B42_391

City centre traffic, 3-lane Westfalendamm, federal...

Skyline of the steel location Duisburg, Thyssenkrupp Steel Europe, in Duisburg-Bruckhausen, sunset,
BRK25B43_383

Skyline of the steel location Duisburg, Thyssenkru...

Duisburg-Bruckhausen steel site, ThyssenKrupp Steel, blast furnaces 8 and 9, on
BRK25B43_384

Duisburg-Bruckhausen steel site, ThyssenKrupp Stee...

A42 motorway bridge, over the Rhine-Herne Canal, with massive structural damage, totally closed for
BRK25B43_385

A42 motorway bridge, over the Rhine-Herne Canal, w...

Winter weather, heavy snowfall, traffic jam on the A40 motorway in Essen, North Rhine-Westphalia,
BRK25B45_425

Winter weather, heavy snowfall, traffic jam on the...

In the early hours of the morning, a section of the Carola Bridge collapsed for unknown reasons.
BRK25B38_028

In the early hours of the morning, a section of th...

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hüttenheim, 2 blast furnaces, coking plant, quenching
BRK25B21_336

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hütt...

Freighter, dilapidated motorway bridge A42, (red arches) over the Rhine-Herne Canal, with massive
BRK25B26_306

Freighter, dilapidated motorway bridge A42, (red a...

Winter weather, heavy snowfall, railway tracks in front of Essen main station, S-Bahn train, North
BRK25B30_280

Winter weather, heavy snowfall, railway tracks in ...

Winter, rainy weather, freezing rain, large puddle, puddle of water, in the city centre, Große
BRK25B36_075

Winter, rainy weather, freezing rain, large puddle...

A57 motorway near Kaarst in the Rhine district of Neuss, view in the direction of the Büttgen
BRK25B36_167

A57 motorway near Kaarst in the Rhine district of ...

Dismantling of the old motorway bridge Neuenkamp, the A40, dismantling of the last bridge pier,
BRK25B37_216

Dismantling of the old motorway bridge Neuenkamp, ...

Winter weather, heavy snowfall, city centre traffic, Alfredstraße, B224, in Essen, person with
BRK25B38_410

Winter weather, heavy snowfall, city centre traffi...

The Berlin Bridge, motorway A59, over the Duisburg port area, 1.8 km long, has a remaining useful
BRK25B00_486

The Berlin Bridge, motorway A59, over the Duisburg...

Urban greening, inner-city street Laan op Zuid, in Rotterdam's Feijenoord district, 4 lanes, 2 tram
BRK25B20_479

Urban greening, inner-city street Laan op Zuid, in...

Urban greening, inner-city street Laan op Zuid, in Rotterdam's Feijenoord district, 4 lanes, 2 tram
BRK25B34_221

Urban greening, inner-city street Laan op Zuid, in...

Blast furnace Schwelgern 1 and 2, strip steel rolls, coils, on freight wagons, at the ThyssenKrupp
BRK25B35_124

Blast furnace Schwelgern 1 and 2, strip steel roll...

New construction of the Neuenkamp motorway bridge on the A40, over the Rhine near Duisburg,
BRK25B35_174

New construction of the Neuenkamp motorway bridge ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK25B09_104

Transport of a 68 metre long, 22 tonne blade of a ...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B09_108

Preparation for the transport of a 68 metre long b...

Motorway bridge of the A42 motorway, Emscher expressway, over the Rhine-Herne Canal heavy goods
BRK25B09_137

Motorway bridge of the A42 motorway, Emscher expre...

Motorway A3 between Düsseldorf and Leverkusen, near Erkrath, freeing of the hard shoulder during
BRK25B14_392

Motorway A3 between Düsseldorf and Leverkusen, nea...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, onlookers, with a
BRK25B29_139

Transport of a 68 metre long, 22 tonne blade of a ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld-Waldbauer, with
BRK25B36_034

Transport of a 68 metre long, 22 tonne blade of a ...

  • Page
  • sur
  • 12