Période

10258 résultats pour : power plants

  • Page
  • sur
  • 103
Connectez-vous pour plus de résultats
Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK24H95_270

Transport of a 68 metre long, 22 tonne blade of a ...

Erection of a wind turbine, wind energy plant, assembly of the ring generator, with a crawler
BRK24H95_272

Erection of a wind turbine, wind energy plant, ass...

Rows of solar panels at the photovoltaic plant of Lucainena de las Torres, aerial view, drone shot,
BRK24H65_103

Rows of solar panels at the photovoltaic plant of ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, onlookers, with a
BRK24H98_066

Transport of a 68 metre long, 22 tonne blade of a ...

The NIAG Rhine port in Rheinberg-Orsoy, unloading of cargo ships with imported coal, then loading
BRK24H99_131

The NIAG Rhine port in Rheinberg-Orsoy, unloading ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK24I00_408

Transport of a 68 metre long, 22 tonne blade of a ...

Tractor with a power harrow prepares the soil of a field for planting, Agriculture, Spring
BRK24H80_018

Tractor with a power harrow prepares the soil of a...

Germany's largest floating solar power plant on the Silbersee III, a quarry pond no longer used for
BRK24I03_366

Germany's largest floating solar power plant on th...

The Doel nuclear power plant on the Scheldt, one of two nuclear power plants in Belgium, consists
BRK24I04_178

The Doel nuclear power plant on the Scheldt, one o...

The F60 overburden conveyor bridge visitor mine is located on Bergheider See near the village of
BRK24H97_453

The F60 overburden conveyor bridge visitor mine is...

Entrance to the seaport of Rotterdam, APL Raffles container freighter, entering Maasvlakte 2, wind
BRK24I02_314

Entrance to the seaport of Rotterdam, APL Raffles ...

Opencast lignite mine Garzweiler 2, excavator 288, bucket wheel excavator, excavates lignite,
BRK24I03_299

Opencast lignite mine Garzweiler 2, excavator 288,...

Garzweiler 2 open-cast lignite mine, people at the edge of the open-cast mine, near the hamlet of
BRK24I04_150

Garzweiler 2 open-cast lignite mine, people at the...

Wind farm near Brilon-Radlinghausen, high-voltage power lines, Sauerland, North Rhine-Westphalia,
BRK24I04_161

Wind farm near Brilon-Radlinghausen, high-voltage ...

Erection of a wind turbine, wind energy plant, assembly of the third blade, with a crawler lattice
BRK24I04_208

Erection of a wind turbine, wind energy plant, ass...

Erection of a wind turbine, wind energy plant, assembly of the third blade, with a crawler lattice
BRK24I04_211

Erection of a wind turbine, wind energy plant, ass...

Extra-high-voltage lines, 380 KV, power line, the electricity comes from the Rhenish lignite mining
BRK24H95_274

Extra-high-voltage lines, 380 KV, power line, the ...

Dorfhain hydropower plant, Francis turbines
BRK24H68_177

Dorfhain hydropower plant, Francis turbines

BGH Freital steelworks
BRK24H70_233

BGH Freital steelworks

Dresden Mitte power station, transformer hall
BRK24H70_269

Dresden Mitte power station, transformer hall

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK24H85_412

Preparation for the transport of a 68 metre long b...

Westereems and Growind wind farms, over 80 wind turbines in total, at the Eemshaven seaport,
BRK24H85_428

Westereems and Growind wind farms, over 80 wind tu...

Port of Hamburg, Container Terminal Altenwerder, container ship during loading and unloading,
BRK24H88_163

Port of Hamburg, Container Terminal Altenwerder, c...

Shipping traffic off Zoutelande province of Zeeland, offshore wind farm, Walcheren peninsula,
BRK24H88_165

Shipping traffic off Zoutelande province of Zeelan...

Presentation of the rapid installation of a solar system on a residential house with a pitched
BRK24H90_498

Presentation of the rapid installation of a solar ...

Newtainer drying machinery biogas electricity generation, AgriGen Ltd, Bentwaters Park, Suffolk,
BRK24H91_386

Newtainer drying machinery biogas electricity gene...

Cleaning technology for solar systems, at the Solar Solutions Düsseldorf trade fair, over 250
BRK24I01_110

Cleaning technology for solar systems, at the Sola...

RWE coal-fired power plant Eemshavencentrale, in the seaport of Eemshaven, operator RWE Power, wind
BRK24I04_165

RWE coal-fired power plant Eemshavencentrale, in t...

Hertern Hydrogen Competence Centre, h2Herten, on the site of the disused Ewald mine in Herten,
BRK24I04_170

Hertern Hydrogen Competence Centre, h2Herten, on t...

Height rescuers from the Oberhausen professional fire brigade practise abseiling from a wind
BRK24H81_030

Height rescuers from the Oberhausen professional f...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK24H81_032

Preparation for the transport of a 68 metre long b...

Height rescuers from the Oberhausen fire brigade practise abseiling from a wind turbine from a
BRK24H81_476

Height rescuers from the Oberhausen fire brigade p...

Height rescuers from the Oberhausen fire brigade practise abseiling from a wind turbine from a
BRK24H83_485

Height rescuers from the Oberhausen fire brigade p...

Storage area for new cars in the port of Vlissingen-Oost, vehicles are temporarily stored on over
BRK24I03_316

Storage area for new cars in the port of Vlissinge...

High-voltage power line route, the space underneath is used for a solar park over 5 km long, behind
BRK24I04_229

High-voltage power line route, the space underneat...

Construction of a wind turbine, Enercon steel pillar, near Kerken, Kleve district, Lower Rhine,
BRK24H97_267

Construction of a wind turbine, Enercon steel pill...

Wind farm near Bad Wünnenberg, Ostwestfalen Lippe, along the A44 motorway, North Rhine-Westphalia,
BRK24H97_271

Wind farm near Bad Wünnenberg, Ostwestfalen Lippe,...

Extra-high-voltage lines, 380 KV, power line, the electricity comes from the Rhenish lignite mining
BRK24H95_273

Extra-high-voltage lines, 380 KV, power line, the ...

Wind farm near Bad Wünnenberg, construction site, toothing on the rotor blades, so-called
BRK24H97_275

Wind farm near Bad Wünnenberg, construction site, ...

Central station with platform hall with glass roof construction with integrated photovoltaic
BRK24I01_070

Central station with platform hall with glass roof...

Height rescuers from the Oberhausen fire brigade practise abseiling from a wind turbine from a
BRK24H85_414

Height rescuers from the Oberhausen fire brigade p...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK24H85_416

Transport of a 68 metre long, 22 tonne blade of a ...

Assembly of a wind turbine, the last rotor blade is being mounted, mobile crane, wind turbine from
BRK24H85_420

Assembly of a wind turbine, the last rotor blade i...

Lignite excavator in the Garzweiler open-cast lignite mine, RWE wind farm, Erkelenz, North
BRK24H85_429

Lignite excavator in the Garzweiler open-cast lign...

Wind farm near Brilon-Radlinghausen, new wind turbine being built, tower elements and rotors ready
BRK24H87_101

Wind farm near Brilon-Radlinghausen, new wind turb...

Erection of a wind turbine, wind energy plant, assembly of the third blade, with a crawler lattice
BRK24H88_316

Erection of a wind turbine, wind energy plant, ass...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK24H88_324

Preparation for the transport of a 68 metre long b...

Biogas plant, gas storage, with dome, use of solid manure as energy source, gas pipelines, on a
BRK24H88_334

Biogas plant, gas storage, with dome, use of solid...

Height rescuers from the Oberhausen fire brigade practise abseiling from a wind turbine from a
BRK24H93_190

Height rescuers from the Oberhausen fire brigade p...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK24H93_191

Transport of a 68 metre long, 22 tonne blade of a ...

Height rescuers from the Oberhausen professional fire brigade practise abseiling from a wind
BRK24H93_194

Height rescuers from the Oberhausen professional f...

Erection of a wind turbine, wind energy plant, assembly of the third blade, with a crawler lattice
BRK24H93_195

Erection of a wind turbine, wind energy plant, ass...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK24H93_196

Preparation for the transport of a 68 metre long b...

Wind farm near Lichtenau, wind turbines, country road, Driburger Straße, North Rhine-Westphalia,
BRK24H93_197

Wind farm near Lichtenau, wind turbines, country r...

Wind farm near Bad Wünnenberg, Ostwestfalen Lippe, along the A44 motorway, North Rhine-Westphalia,
BRK24H93_200

Wind farm near Bad Wünnenberg, Ostwestfalen Lippe,...

Biogas plant, storage silos, large buffer tank for hot water for intermediate energy storage,
BRK24H97_286

Biogas plant, storage silos, large buffer tank for...

Wind farm near Brilon-Radlinghausen, new wind turbine being built, mobile crane, North
BRK24H99_365

Wind farm near Brilon-Radlinghausen, new wind turb...

Solar park on the Slaperdijk dyke near the Eemshaven, test project, 17, 000 solar modules were
BRK24H99_371

Solar park on the Slaperdijk dyke near the Eemshav...

The Lausward natural gas power plant, the most efficient gas and steam turbine power plant in the
BRK24I00_415

The Lausward natural gas power plant, the most eff...

Garzweiler II open-cast lignite mine
BRK24I00_420

Garzweiler II open-cast lignite mine

Biogas plant, gas storage, with dome, use of solid manure as energy source, storage area, on a farm
BRK24I00_423

Biogas plant, gas storage, with dome, use of solid...

The Doel nuclear power plant on the Scheldt, one of two nuclear power plants in Belgium, consists
BRK24I04_169

The Doel nuclear power plant on the Scheldt, one o...

Height rescuers from the Oberhausen fire brigade practise abseiling from a wind turbine from a
BRK24H80_447

Height rescuers from the Oberhausen fire brigade p...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK24H83_487

Transport of a 68 metre long, 22 tonne blade of a ...

Installation of solar modules on the roof of a barn on a farm, over 240 photovoltaic modules are
BRK24I04_215

Installation of solar modules on the roof of a bar...

Storage area for new cars in the port of Vlissingen-Oost, vehicles are temporarily stored on over
BRK24H89_365

Storage area for new cars in the port of Vlissinge...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK24H97_265

Preparation for the transport of a 68 metre long b...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK24H97_266

Transport of a 68 metre long, 22 tonne blade of a ...

Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines
BRK24H93_477

Demolished tower of a 20 year old wind turbine, in...

Transport of a 70 metre long rotor blade, construction of a wind power plant in a wind farm near
BRK24H93_481

Transport of a 70 metre long rotor blade, construc...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK24H95_271

Preparation for the transport of a 68 metre long b...

The power plant Mitte power station in Dresden was a fossil-fuelled combined heat and power plant
BRK24I04_197

The power plant Mitte power station in Dresden was...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK24H85_409

Transport of a 68 metre long, 22 tonne blade of a ...

Construction of a wind turbine, Enercon steel pillar, near Kerken, Kleve district, Lower Rhine,
BRK24H85_430

Construction of a wind turbine, Enercon steel pill...

Chimneys, smoke plume of the RWE coal-fired power plant Eemshavencentrale, wind power plant, in the
BRK24H87_109

Chimneys, smoke plume of the RWE coal-fired power ...

Vopak Solarpark Eemshaven, 19 hectares of solar modules with a capacity of 25 megawatts, around the
BRK24H93_118

Vopak Solarpark Eemshaven, 19 hectares of solar mo...

Opencast lignite mine Garzweiler 2, bucket wheel excavator, excavator at the hamlet of Lützerath,
BRK24H93_198

Opencast lignite mine Garzweiler 2, bucket wheel e...

Lignite-fired power plant, RWE Power AG Niederaussem power plant, sunset, Bergheim, North
BRK24H95_276

Lignite-fired power plant, RWE Power AG Niederauss...

The Datteln 4 hard coal-fired power plant, operated by Uniper, on the Dormtund-Ems Canal, scheduled
BRK24H95_479

The Datteln 4 hard coal-fired power plant, operate...

The Datteln 4 hard coal-fired power plant, operated by Uniper, on the Dormtund-Ems Canal, scheduled
BRK24H99_377

The Datteln 4 hard coal-fired power plant, operate...

A58 motorway, photovoltaic systems were installed on the slopes to the side of the carriageway, use
BRK24I00_406

A58 motorway, photovoltaic systems were installed ...

Storm damage, broken wind turbine, Colmitz, Saxony, Germany, Europe
BRK24I01_250

Storm damage, broken wind turbine, Colmitz, Saxony...

WHE Westthafen Wanne, coal for power plants is transferred from a Belgian cargo ship coming from
BRK24I02_269

WHE Westthafen Wanne, coal for power plants is tra...

LPG tanker Navigator Genesis, Liquefied Petroleum Gas, Autogas, liquid gas transport, in the
BRK24I04_163

LPG tanker Navigator Genesis, Liquefied Petroleum ...

The coking plant of the Gneisenau colliery in Dortmund-Oespel was rocked by an explosion on 17 July
BRK24H69_147

The coking plant of the Gneisenau colliery in Dort...

Dorfhain hydropower plant, Francis turbines
BRK24H76_429

Dorfhain hydropower plant, Francis turbines

The F60 overburden conveyor bridge visitor mine is located on Bergheider See near the village of
BRK24H97_454

The F60 overburden conveyor bridge visitor mine is...

The Plessa power station is an industrial monument in the southern Brandenburg municipality of
BRK24H97_455

The Plessa power station is an industrial monument...

Wind farm near Bad Wünneberg, biogas plant, Ostwestfalen Lippe, North Rhine-Westphalia, Germany,
BRK24H97_272

Wind farm near Bad Wünneberg, biogas plant, Ostwes...

Ice formations at the hydropower plant in Niezelgrund
BRK24H66_163

Ice formations at the hydropower plant in Niezelgr...

Detached house with various solar modules, in addition to normal standard solar panels, PV tube
BRK24H87_096

Detached house with various solar modules, in addi...

Evening atmosphere on the Hoheward spoil tip, the largest spoil tip in the Ruhr area, between
BRK24H92_041

Evening atmosphere on the Hoheward spoil tip, the ...

The puppet theatre collection of the Staatliche Kunstsammlungen Dresden (SKD), one of the largest
BRK24I04_205

The puppet theatre collection of the Staatliche Ku...

Height rescuers from the Oberhausen professional fire brigade practise abseiling from a wind
BRK24H85_411

Height rescuers from the Oberhausen professional f...

Wind farm near Lichtenau, Ostwestfalen-Lippe, a 100 kW solar power system was installed on the
BRK24H85_419

Wind farm near Lichtenau, Ostwestfalen-Lippe, a 10...

Construction site of a new wind turbine, modules of the tower, wind turbine from the manufacturer
BRK24H85_421

Construction site of a new wind turbine, modules o...

Composting plant, organic waste is composted, sorted by size, smaller parts are reused as compost,
BRK24H85_427

Composting plant, organic waste is composted, sort...

Wind farm near Bad Wünnenberg, Ostwestfalen Lippe, along the A44 motorway, North Rhine-Westphalia,
BRK24H85_442

Wind farm near Bad Wünnenberg, Ostwestfalen Lippe,...

Offshore working vessels, Buss Terminal Eemshaven, logistics hub for the offshore wind farm
BRK24H87_110

Offshore working vessels, Buss Terminal Eemshaven,...

E-fuelling station on the site of the former Lohberg colliery in Dinslaken, 4 300 kW fast-charging
BRK24H87_201

E-fuelling station on the site of the former Lohbe...

  • Page
  • sur
  • 103