Période

1534 résultats pour : steel company

  • Page
  • sur
  • 16
Connectez-vous pour plus de résultats
Construction site, reinforced concrete reinforcement bars, for a building ceiling, are installed
BRK25B69_198

Construction site, reinforced concrete reinforceme...

Construction of a high-bay warehouse, storage system for high space utilisation, in steel
BRK25B69_222

Construction of a high-bay warehouse, storage syst...

Cargo ships on the Rhine near Duisburg, near Ruhrort harbour, Friedrich Ebert Bridge, behind
BRK25B78_158

Cargo ships on the Rhine near Duisburg, near Ruhro...

Grain field, harvested, straw bales, near Duisburg-Baerl, behind the motorway bridge of the A42
BRK25B95_308

Grain field, harvested, straw bales, near Duisburg...

Minister President Michael Kretschmer takes part in the inauguration of a hydrogen-capable forging
BRK25B68_498

Minister President Michael Kretschmer takes part i...

Steel production at the Hoesch AG steelworks in the Westfalenhuette on 4.12.1974 at the blast
BRK25B62_415

Steel production at the Hoesch AG steelworks in th...

Construction site, concreting, the floor slab of a building is concreted, the concrete is pumped
BRK25B69_212

Construction site, concreting, the floor slab of a...

The Thyssenkrupp Steel steelworks in Duisburg-Marxloh, on the Rhine, coking plant unloading tower,
BRK25B71_425

The Thyssenkrupp Steel steelworks in Duisburg-Marx...

The Thyssenkrupp Steel steelworks in Duisburg-Marxloh, on the Rhine, Blast Furnace 1, Black Giant,
BRK25B77_251

The Thyssenkrupp Steel steelworks in Duisburg-Marx...

The Rhine near Duisburg, cargo ships, backdrop of the ThyssenKrupp Steel steelworks in Duisburg
BRK25B78_155

The Rhine near Duisburg, cargo ships, backdrop of ...

Panorama of the Thyssenkrupp Steel steelworks in Duisburg-Marxloh, on the Rhine, STEAG coal-fired
BRK25B90_058

Panorama of the Thyssenkrupp Steel steelworks in D...

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hüttenheim, coking plant and 2 blast furnaces, North
BRK25B67_319

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hütt...

Loading cranes at Schwelgern harbour, ThyssenKrupp Steel, cargo ship on the Rhine, Duisburg, North
BRK25B78_147

Loading cranes at Schwelgern harbour, ThyssenKrupp...

Allotment garden site allotment garden association Haus-Knipp e.V, in Duisburg-Beeckerwerth, on the
BRK25B87_111

Allotment garden site allotment garden association...

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hüttenheim, coking plant and 2 blast furnaces,
BRK25B87_163

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hütt...

Steelworkers at a demonstration in front of the headquarters of ThyssenKrupp Steel Europe in
BRK25B95_359

Steelworkers at a demonstration in front of the he...

Steelworkers at a demonstration in front of the headquarters of ThyssenKrupp Steel Europe in
BRK25B67_324

Steelworkers at a demonstration in front of the he...

New construction of the motorway bridge Neuenkamp of the A40, over the Rhine near Duisburg,
BRK25B67_378

New construction of the motorway bridge Neuenkamp ...

Kaiser-Wilhelm-Straße, petrol station, view of the ThyssenKrupp Steel Bruckhausen steelworks, blast
BRK25B68_415

Kaiser-Wilhelm-Straße, petrol station, view of the...

Sunset, cargo ships on the Rhine, steelworks, Hüttenwerke Krupp Mannesmann, cooling towers of the
BRK25B69_326

Sunset, cargo ships on the Rhine, steelworks, Hütt...

View, from the Rheinpreußen spoil tip in Mörs, across the Rhine to the Thyssenkrupp Steel
BRK25B78_151

View, from the Rheinpreußen spoil tip in Mörs, acr...

Skyline of the steel location Duisburg, Thyssenkrupp Steel Europe, in Duisburg-Bruckhausen, sunset,
BRK25B78_154

Skyline of the steel location Duisburg, Thyssenkru...

Strip steel coils, on freight wagons, at the ThyssenKrupp Schwelgern plant in Duisburg-Marxloh is
BRK25B78_180

Strip steel coils, on freight wagons, at the Thyss...

Rhine near Duisburg-Bruckhausen, walkers on the Rhine dyke, winter, Duisburg, North
BRK25B87_049

Rhine near Duisburg-Bruckhausen, walkers on the Rh...

Rhine near Duisburg Bruckhausen, Marxloh, Thyssenkrupp Steel steelworks, blast furnaces, sintering
BRK25B87_102

Rhine near Duisburg Bruckhausen, Marxloh, Thyssenk...

Work on the construction site of the real estate project Stadtquartier Essen 51, in Essen, on the
BRK25B95_248

Work on the construction site of the real estate p...

ThyssenKrupp steelworks in Duisburg-Marxloh, blast furnace Schwelgern 2, coal store of the
BRK25B95_252

ThyssenKrupp steelworks in Duisburg-Marxloh, blast...

A40 motorway, thyssenkrupp Steel Europe AG Bochum plant, advertising for hydrogen as an energy
BRK25B95_253

A40 motorway, thyssenkrupp Steel Europe AG Bochum ...

Stainless steel tanks of a large silo facility in Duisburg inland harbour, Duisburg-Neuenkamp, for
BRK25B95_296

Stainless steel tanks of a large silo facility in ...

Skyline of the Duisburg steel site, Thyssenkrupp Steel Europe, in Duisburg-Bruckhausen, sunset,
BRK25B95_345

Skyline of the Duisburg steel site, Thyssenkrupp S...

Cargo ships on the Rhine at Rheinberg, in the background the STEAG coal-fired power plant Duisburg
BRK25B67_342

Cargo ships on the Rhine at Rheinberg, in the back...

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hüttenheim, 2 blast furnaces, coking plant, cargo
BRK25B68_289

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hütt...

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hüttenheim, 2 blast furnaces, coking plant, quenching
BRK25B68_290

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hütt...

Friedrich-Ebert-Straße in Duisburg-Beeck, near the König brewery, view to the north of the
BRK25B78_165

Friedrich-Ebert-Straße in Duisburg-Beeck, near the...

The ThyssenKrupp Steel steelworks in Duisburg-Beeckerwerth, blast furnaces 8 and 9 on the right,
BRK25B67_396

The ThyssenKrupp Steel steelworks in Duisburg-Beec...

The Konrad Adenauer Bridge, South Bridge, A562 motorway bridge and 2 light rail lines, tram, UN
BRK25B71_202

The Konrad Adenauer Bridge, South Bridge, A562 mot...

Rhine promenade in Duisburg-Wanheim, sunset, view of the Rhine and Hüttenwerke Krupp Mannesmann,
BRK25B78_145

Rhine promenade in Duisburg-Wanheim, sunset, view ...

Industrial backdrop of the ThyssenKrupp Steel steelworks in Bruckhausen, on the Rhine, Schwelgern
BRK25B78_174

Industrial backdrop of the ThyssenKrupp Steel stee...

Low water level on the Rhine, banks dry up, sandbanks in the river, shipping can only navigate with
BRK25B78_183

Low water level on the Rhine, banks dry up, sandba...

Rhine at Duisburg-Bruckhausen, towers of the water extraction facilities of ThyssenKrupp Steel
BRK25B87_105

Rhine at Duisburg-Bruckhausen, towers of the water...

Rhine at Duisburg-Bruckhausen, towers of the water extraction facilities of ThyssenKrupp Steel
BRK25B95_246

Rhine at Duisburg-Bruckhausen, towers of the water...

Cargo ships on the Rhine near Duisburg, houses on Deichstrasse, industrial backdrop of the
BRK25B95_269

Cargo ships on the Rhine near Duisburg, houses on ...

View over the Ruhr valley, to the west, from Mülheim an der Ruhr, in the direction of
BRK25B95_306

View over the Ruhr valley, to the west, from Mülhe...

Industrial backdrop of the ThyssenKrupp Steel steelworks in Bruckhausen, on the Rhine, Schwelgern
BRK25B95_309

Industrial backdrop of the ThyssenKrupp Steel stee...

View across the Rhine to the Thyssenkrupp Steel steelworks in Duisburg-Beeckerwerth, blast
BRK25B95_381

View across the Rhine to the Thyssenkrupp Steel st...

A42 motorway bridge over the Rhine at Duisburg Beeckerwerth, Thyssenkrupp Steel steelworks, blast
BRK25B95_383

A42 motorway bridge over the Rhine at Duisburg Bee...

With a siege and temporary occupation of the Hoesch AG headquarters on 11.9.1969, spontaneous
BRK25B59_272

With a siege and temporary occupation of the Hoesc...

Rhine at Duisburg-Bruckhausen, steelworks Thyssenkrupp Steel, walkers on the Rhine dyke, winter,
BRK25B87_106

Rhine at Duisburg-Bruckhausen, steelworks Thyssenk...

Construction of a high-bay warehouse, storage system for high space utilisation, in steel
BRK25B96_133

Construction of a high-bay warehouse, storage syst...

IG Metall warning strike at Hoesch AG Westfalenhuette to preserve co-determination on 29.07.1980 in
BRK25B52_292

IG Metall warning strike at Hoesch AG Westfalenhue...

With a siege and temporary occupation of the Hoesch AG headquarters on 11.9.1969, spontaneous
BRK25B54_029

With a siege and temporary occupation of the Hoesc...

With a siege and temporary occupation of the Hoesch AG headquarters on 11.9.1969, spontaneous
BRK25B54_030

With a siege and temporary occupation of the Hoesc...

Duisburg-Bruckhausen steel site, ThyssenKrupp Steel, blast furnaces 8 and 9 Duisburg, North
BRK25B67_331

Duisburg-Bruckhausen steel site, ThyssenKrupp Stee...

View of Duisburg-Bruckhausen, Marxloh, steelworks, blast furnaces, coking plant, skyline of
BRK25B67_372

View of Duisburg-Bruckhausen, Marxloh, steelworks,...

The Thyssenkrupp Steel steelworks in Duisburg-Marxloh, on the Rhine, coking plant unloading tower,
BRK25B77_250

The Thyssenkrupp Steel steelworks in Duisburg-Marx...

Major construction site in Düsseldorf, on the B8, Danziger Straße, construction of a residential
BRK25B77_487

Major construction site in Düsseldorf, on the B8, ...

The river Rhine near Duisburg, Thyssenkrupp Steel steelworks in Bruckhausen, cargo ship, Duisburg,
BRK25B78_146

The river Rhine near Duisburg, Thyssenkrupp Steel ...

Demonstration of many thousands of steelworkers in front of the ThyssenKrupp headquarters in Essen,
BRK25B78_199

Demonstration of many thousands of steelworkers in...

The headquarters of thyssenkrupp Steel Europe AG in Duisburg-Bruckhausen, Kaiser-Wilhelm-Straße,
BRK25B79_369

The headquarters of thyssenkrupp Steel Europe AG i...

Duisburg-Bruckhausen steel site, ThyssenKrupp Steel, blast furnaces 8 and 9, on
BRK25B87_151

Duisburg-Bruckhausen steel site, ThyssenKrupp Stee...

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hüttenheim, 2 blast furnaces, coking plant, quenching
BRK25B90_063

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hütt...

Minister President Michael Kretschmer takes part in the inauguration of a hydrogen-capable forging
BRK25B68_497

Minister President Michael Kretschmer takes part i...

Duisburg, North Rhine-Westphalia, Germany - Cityscape in the Ruhr area with cargo ship on the Rhine
BRK25B72_431

Duisburg, North Rhine-Westphalia, Germany - Citysc...

Bottrop, North Rhine-Westphalia, Germany, The Prosper coking plant is one of three operating coking
BRK25B90_166

Bottrop, North Rhine-Westphalia, Germany, The Pros...

Bottrop, North Rhine-Westphalia, Germany, The Prosper coking plant is one of three operating coking
BRK25B78_318

Bottrop, North Rhine-Westphalia, Germany, The Pros...

Duisburg, North Rhine-Westphalia, Germany, freighter at the southern harbour, Holcim cement works
BRK25B78_279

Duisburg, North Rhine-Westphalia, Germany, freight...

Wismar, Mecklenburg-Vorpommern, Germany, MV Werften Wismar-Rostock-Stralsund. The cruise ship
BRK25B89_133

Wismar, Mecklenburg-Vorpommern, Germany, MV Werfte...

Duisburg, Ruhr area, North Rhine-Westphalia, Germany, city view with the ThyssenKrupp Steel
BRK25B90_168

Duisburg, Ruhr area, North Rhine-Westphalia, Germa...

Duisburg, North Rhine-Westphalia, Germany, freighter at the southern harbour, Holcim cement works
BRK25B90_207

Duisburg, North Rhine-Westphalia, Germany, freight...

Finished galvanised steel parts lie in the factory hall of a surface finishing factory of the
BRK25B64_495

Finished galvanised steel parts lie in the factory...

11.01.2024, Essen, North Rhine-Westphalia, Germany, ThyssenKrupp, company logo in front of the
BRK25B90_165

11.01.2024, Essen, North Rhine-Westphalia, Germany...

Duisburg-Bruckhausen steel site, ThyssenKrupp Steel, blast furnaces 8 and 9 Duisburg, North
BRK25B20_023

Duisburg-Bruckhausen steel site, ThyssenKrupp Stee...

The Thyssenkrupp Steel steelworks in Duisburg-Marxloh, on the Rhine, coking plant unloading tower,
BRK25B20_400

The Thyssenkrupp Steel steelworks in Duisburg-Marx...

The Thyssenkrupp Steel steelworks in Duisburg-Marxloh, on the Rhine, quenching tower of the coking
BRK25B20_401

The Thyssenkrupp Steel steelworks in Duisburg-Marx...

The Thyssenkrupp Steel steelworks in Duisburg-Marxloh, on the Rhine, quenching tower of the coking
BRK25B20_402

The Thyssenkrupp Steel steelworks in Duisburg-Marx...

Thyssenkrupp Steel steelworks in Duisburg-Bruckhausen, thyssenkrupp Steel Europe AG, hot strip mill
BRK25B22_214

Thyssenkrupp Steel steelworks in Duisburg-Bruckhau...

Construction site, concreting, the lift shaft of a building is concreted, the concrete is placed on
BRK25B26_273

Construction site, concreting, the lift shaft of a...

Duisburg-Bruckhausen steel site, ThyssenKrupp Steel, blast furnaces 8 and 9, North
BRK25B26_386

Duisburg-Bruckhausen steel site, ThyssenKrupp Stee...

Duisburg-Bruckhausen steel site, ThyssenKrupp Steel, blast furnaces 8 and 9, on
BRK25B26_390

Duisburg-Bruckhausen steel site, ThyssenKrupp Stee...

Cable drums for TCP pipes that transport hydrogen from offshore wind farms to land, special
BRK25B26_470

Cable drums for TCP pipes that transport hydrogen ...

The Thyssenkrupp Steel steelworks in Duisburg-Marxloh, on the Rhine, quenching tower of the coking
BRK25B30_045

The Thyssenkrupp Steel steelworks in Duisburg-Marx...

View of the STEAG coal-fired power plant Walsum, Block 10, cooling tower, parts of the Thyssenkrupp
BRK25B34_209

View of the STEAG coal-fired power plant Walsum, B...

Prosper coking plant, operated by the ArcelorMittal steel group, 146 coke ovens with a daily output
BRK25B34_325

Prosper coking plant, operated by the ArcelorMitta...

Sunset, cargo ships on the Rhine, steelworks, Hüttenwerke Krupp Mannesmann, discharge cloud of the
BRK25B35_121

Sunset, cargo ships on the Rhine, steelworks, Hütt...

Rhine at Duisburg-Bruckhausen, towers of the water extraction facilities of ThyssenKrupp Steel
BRK25B35_123

Rhine at Duisburg-Bruckhausen, towers of the water...

The Rhine near Duisburg, cargo ships, backdrop of the ThyssenKrupp Steel steelworks in Duisburg
BRK25B35_150

The Rhine near Duisburg, cargo ships, backdrop of ...

Rhine near Duisburg-Bruckhausen, walkers on the Rhine dyke, winter, Duisburg, North
BRK25B35_165

Rhine near Duisburg-Bruckhausen, walkers on the Rh...

Skyline of the Duisburg steel site, Thyssenkrupp Steel Europe, in Duisburg-Bruckhausen, sunset,
BRK25B35_183

Skyline of the Duisburg steel site, Thyssenkrupp S...

Construction of a high-bay warehouse, storage system for high space utilisation, in steel
BRK25B36_158

Construction of a high-bay warehouse, storage syst...

The Berlin Bridge, motorway A59, over the Duisburg port area, 1.8 km long, has a remaining useful
BRK25B36_248

The Berlin Bridge, motorway A59, over the Duisburg...

View of Duisburg-Bruckhausen, Marxloh, steelworks, blast furnaces, coking plant, skyline of
BRK25B42_480

View of Duisburg-Bruckhausen, Marxloh, steelworks,...

Cargo ship at low water on the Rhine near Duisburg-Homberg, view of Duisburg-Laar, houses on
BRK25B43_286

Cargo ship at low water on the Rhine near Duisburg...

Stainless steel tanks of a large silo facility in Duisburg inland harbour, Duisburg-Neuenkamp, for
BRK25B43_309

Stainless steel tanks of a large silo facility in ...

Work on the construction site of the real estate project Stadtquartier Essen 51, in Essen, on the
BRK25B43_312

Work on the construction site of the real estate p...

Skyline of the steel location Duisburg, Thyssenkrupp Steel Europe, in Duisburg-Bruckhausen, sunset,
BRK25B43_383

Skyline of the steel location Duisburg, Thyssenkru...

Duisburg-Bruckhausen steel site, ThyssenKrupp Steel, blast furnaces 8 and 9, on
BRK25B43_384

Duisburg-Bruckhausen steel site, ThyssenKrupp Stee...

The Ruhr Tech Campus Essen, formerly the Thyssenkrupp Campus, headquarters of Thyssenkrupp,
BRK25B20_222

The Ruhr Tech Campus Essen, formerly the Thyssenkr...

Rhine at Duisburg-Bruckhausen, steelworks Thyssenkrupp Steel, walkers on the Rhine dyke, winter,
BRK25B21_202

Rhine at Duisburg-Bruckhausen, steelworks Thyssenk...

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hüttenheim, 2 blast furnaces, coking plant, quenching
BRK25B21_336

Hüttenwerke Krupp-Mannesmann, HKM in Duisburg-Hütt...

Construction of a high-bay warehouse, storage system for high space utilisation, in steel
BRK25B26_288

Construction of a high-bay warehouse, storage syst...

  • Page
  • sur
  • 16