Period

369 results for: hydraulic

  • Page
  • of
  • 4
Please sign in for more results
Grimsby Dock Tower 1852, hydraulic accumulator tower designer James William Wild, Grimsby,
BRK25C37_058

Grimsby Dock Tower 1852, hydraulic accumulator tow...

Grimsby Dock Tower 1852, hydraulic accumulator tower designer James William Wild, Grimsby,
BRK25C37_162

Grimsby Dock Tower 1852, hydraulic accumulator tow...

Grimsby Dock Tower 1852, hydraulic accumulator tower designer James William Wild, Grimsby,
BRK25C37_164

Grimsby Dock Tower 1852, hydraulic accumulator tow...

Rollberg (inclined planes), on which the ships are transported over land on rail wagons using a
BRK25C29_227

Rollberg (inclined planes), on which the ships are...

Rollberg (inclined planes), on which the ships are transported overland on rail wagons using a
BRK25C24_230

Rollberg (inclined planes), on which the ships are...

Rollberg (inclined planes), on which the ships are transported overland on rail wagons using a
BRK25C36_046

Rollberg (inclined planes), on which the ships are...

Mont-Saint-Michel, tidal dam on the mainland, hydraulic drives, Couesnon river dyke at the back
BRK25C43_195

Mont-Saint-Michel, tidal dam on the mainland, hydr...

Rollberg (inclined planes), on which the ships are transported over land on rail wagons using a
BRK25C21_231

Rollberg (inclined planes), on which the ships are...

Rollberg (inclined planes), on which the ships are transported over land on rail wagons using a
BRK25C32_423

Rollberg (inclined planes), on which the ships are...

The Boye, stream, runs for 13.8 km through the cities of Gladbeck, Bottrop (photo) and Essen, a
BRK25B95_305

The Boye, stream, runs for 13.8 km through the cit...

After the flood of 2002, the Malter dam was upgraded with a new emergency spillway, Malter, Saxony,
BRK25B68_481

After the flood of 2002, the Malter dam was upgrad...

The Boye, stream, runs for 13.8 km through the towns of Gladbeck, Bottrop (photo) and Essen, a
BRK25B95_304

The Boye, stream, runs for 13.8 km through the tow...

The Katernberger Bach, for over 40 years the stream was piped, 1.2 km long, underground, used as a
BRK25B87_110

The Katernberger Bach, for over 40 years the strea...

Boyetal-Ost landscape conservation area, flood meadows, lower course of the Boye, stream, runs
BRK25B95_303

Boyetal-Ost landscape conservation area, flood mea...

10.11.2021, Datteln, North Rhine-Westphalia, Germany - Following the construction of a parallel
BRK25B81_322

10.11.2021, Datteln, North Rhine-Westphalia, Germa...

Dam wall with barrage on the Murg, Murg valley, dam, hydro engineering, hydraulic engineering,
BRK25B88_294

Dam wall with barrage on the Murg, Murg valley, da...

Hagen, North Rhine-Westphalia, Germany - New construction of the A45 Lennetal motorway bridge, the
BRK25B88_471

Hagen, North Rhine-Westphalia, Germany - New const...

10.11.2021, Datteln, North Rhine-Westphalia, Germany - Lippe, river and floodplain development of
BRK25B90_276

10.11.2021, Datteln, North Rhine-Westphalia, Germa...

Hagen, North Rhine-Westphalia, Germany - New construction of the A45 Lennetal motorway bridge, the
BRK25B76_154

Hagen, North Rhine-Westphalia, Germany - New const...

Maljamar, New Mexico, Even as New Mexico is in the midst of extreme drought, freshwater is sold for
BRK25B17_042

Maljamar, New Mexico, Even as New Mexico is in the...

Working excavator tractor digging A trench
BRK25B35_064

Working excavator tractor digging A trench

Boyetal-Ost landscape conservation area, flood meadows, lower course of the Boye, stream, runs
BRK25B26_369

Boyetal-Ost landscape conservation area, flood mea...

Renaturalisation work on the Boye, Emscher tributary, now sewage-free, the wastewater flows in the
BRK25B43_318

Renaturalisation work on the Boye, Emscher tributa...

After the flood of 2002, the Malter dam was upgraded with a new emergency spillway, Malter, Saxony,
BRK25B46_492

After the flood of 2002, the Malter dam was upgrad...

Emscherland, a new nature and water adventure park on the renaturalised Emscher, at the water
BRK25B21_266

Emscherland, a new nature and water adventure park...

Youth centre Freie Schule am Katernberger Bach, for over 40 years the stream was piped, 1.2 km
BRK25A61_221

Youth centre Freie Schule am Katernberger Bach, fo...

Weir at a watermill, Winter, Münsterland, North Rhine-Westphalia, Germany, Europe
BRK25A73_480

Weir at a watermill, Winter, Münsterland, North Rh...

Emscherland, a new nature and water adventure park on the renaturalised Emscher, at the water
BRK25A52_338

Emscherland, a new nature and water adventure park...

The Katernberger Bach, for over 40 years the stream was piped, 1.2 km long, underground, used as a
BRK25A81_252

The Katernberger Bach, for over 40 years the strea...

Cargo ship, loaded with containers, on the Rhine near Duisburg, the wheelhouse is raised to ensure
BRK25A65_298

Cargo ship, loaded with containers, on the Rhine n...

The river Emscher, wastewater river, which is now being renaturalised again, the wastewater runs
BRK25A65_372

The river Emscher, wastewater river, which is now ...

Electrical power and hydraulic fluid supply lines on heavy duty backhoe excavator, Quebec, Canada,
BRK25A34_498

Electrical power and hydraulic fluid supply lines ...

Construction site underground underground station Düsseldorf Airport, U 81, civil engineering with
BRK25A22_091

Construction site underground underground station ...

Emscherland, a new nature and water adventure park on the renaturalised Emscher, at the water
BRK25A32_104

Emscherland, a new nature and water adventure park...

Heavy construction machine with hydraulic arm carries out track work, track construction, Hermann
BRK25A37_230

Heavy construction machine with hydraulic arm carr...

Riverside path along the Boye, emergency board, with location designation, stream, runs for 13.8 km
BRK25A25_303

Riverside path along the Boye, emergency board, wi...

The Katernberger Bach, for over 40 years the stream was piped, 1.2 km long, underground, used as a
BRK25A25_305

The Katernberger Bach, for over 40 years the strea...

The Falkirk Wheel, a hydraulic structure, moves boats between two canals at different levels, Forth
BRK24I18_070

The Falkirk Wheel, a hydraulic structure, moves bo...

After the flood of 2002, the Malter dam was upgraded with a new emergency spillway, Malter, Saxony,
BRK24I31_168

After the flood of 2002, the Malter dam was upgrad...

After the flood of 2002, the Malter dam was upgraded with a new emergency spillway, Malter, Saxony,
BRK24I94_325

After the flood of 2002, the Malter dam was upgrad...

Emscherland, a new nature and water adventure park on the renaturalised Emscher, at the water
BRK24I42_283

Emscherland, a new nature and water adventure park...

Renaturalisation work on the Boye, Emscher tributary, now sewage-free, the wastewater flows in the
BRK24I38_341

Renaturalisation work on the Boye, Emscher tributa...

Emscherland, a new nature and water adventure park on the renaturalised Emscher, at the water
BRK24I15_180

Emscherland, a new nature and water adventure park...

The Boye, stream, runs for 13.8 km through the cities of Gladbeck, Bottrop (photo) and Essen, a
BRK24I18_164

The Boye, stream, runs for 13.8 km through the cit...

Neue Mitte Oberhausen, Gasometer exhibition hall, after renovation, Emscher River, evening
BRK24I28_468

Neue Mitte Oberhausen, Gasometer exhibition hall, ...

Construction site for the demolition of a building with construction fence and hydraulic excavators
BRK24I80_122

Construction site for the demolition of a building...

A close-up of a hydraulic gripper arm system in use, glass fibre construction, Nagold, Black
BRK24I94_289

A close-up of a hydraulic gripper arm system in us...

In the highlands of Abyssinia, in the Semien Mountains, construction of a new pass road, Ethiopia,
BRK24I16_059

In the highlands of Abyssinia, in the Semien Mount...

The River Emscher, former sewage river, after the Emscher conversion, in Oberhausen, North
BRK24H96_499

The River Emscher, former sewage river, after the ...

Hydraulic system backlit with visible metal parts and shadows, fibreglass construction, Nagold,
BRK24H78_443

Hydraulic system backlit with visible metal parts ...

The Katernberger Bach, for over 40 years the stream was piped, 1.2 km long, underground, used as a
BRK24H22_424

The Katernberger Bach, for over 40 years the strea...

Emscherland, a new nature and water adventure park on the renaturalised Emscher, at the water
BRK24H22_427

Emscherland, a new nature and water adventure park...

The Boye, stream, runs for 13.8 km through the towns of Gladbeck, Bottrop (photo) and Essen, a
BRK24H36_396

The Boye, stream, runs for 13.8 km through the tow...

The Katernberger Bach, for over 40 years the stream was piped, 1.2 km long, underground, used as a
BRK24H36_416

The Katernberger Bach, for over 40 years the strea...

The River Emscher, sewage river, old railway bridge, now a footpath and cycle path, bridge for
BRK24G43_158

The River Emscher, sewage river, old railway bridg...

After the flood of 2002, the Malter dam was upgraded with a new emergency spillway, Malter, Saxony,
BRK24G22_121

After the flood of 2002, the Malter dam was upgrad...

SALO, FINLAND, NOVEMBER 19, 2016: Unnamed operator stacks up wood on the bunk of Komatsu 845
BRK24G08_462

SALO, FINLAND, NOVEMBER 19, 2016: Unnamed operator...

SALO, FINLAND, NOVEMBER 27, 2016: Doosan DX255LC Medium Crawler Excavator at work in the road
BRK24G08_088

SALO, FINLAND, NOVEMBER 27, 2016: Doosan DX255LC M...

Emscherland, a new nature and water adventure park on the renaturalised Emscher, at the water
BRK24G45_187

Emscherland, a new nature and water adventure park...

Paths, information board at the Katernberger Bach, for over 40 years the stream was piped, 1.2 km
BRK24G50_300

Paths, information board at the Katernberger Bach,...

In the highlands of Abyssinia, in the Semien Mountains, construction of a new pass road, Ethiopia,
BRK24G42_119

In the highlands of Abyssinia, in the Semien Mount...

Coal mining in open-cast mine
BRK24F78_185

Coal mining in open-cast mine

After the flood of 2002, the Malter dam was upgraded with a new emergency spillway, Malter, Saxony,
BRK24F52_210

After the flood of 2002, the Malter dam was upgrad...

The River Emscher, sewage river, old railway bridge, now a footpath and cycle path, bridge for
BRK24F74_083

The River Emscher, sewage river, old railway bridg...

The Boye, stream, runs for 13.8 km through the cities of Gladbeck, Bottrop (photo) and Essen, a
BRK24F73_121

The Boye, stream, runs for 13.8 km through the cit...

Construction site underground underground station Düsseldorf Airport, U 81, civil engineering with
BRK24F43_389

Construction site underground underground station ...

Construction site underground underground station Düsseldorf Airport, U 81, civil engineering with
BRK24F36_056

Construction site underground underground station ...

Pirna southern bypass
BRK24F03_311

Pirna southern bypass

Southern bypass
BRK24E89_403

Southern bypass

Southern bypass
BRK24F12_308

Southern bypass

Pirna southern bypass
BRK24E87_497

Pirna southern bypass

Southern bypass
BRK24F15_088

Southern bypass

Southern bypass
BRK24E97_176

Southern bypass

Southern bypass
BRK24F02_340

Southern bypass

Pirna southern bypass
BRK24E67_144

Pirna southern bypass

Southern bypass
BRK24E84_200

Southern bypass

Boyetal-Ost landscape conservation area, flood meadows, lower course of the Boye, stream, runs
BRK24E74_283

Boyetal-Ost landscape conservation area, flood mea...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_402

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_411

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_420

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_401

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_412

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_419

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_409

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_410

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_407

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_416

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_425

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_451

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_408

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_415

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_426

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_405

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_418

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_427

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_406

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_417

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_428

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_403

The new bridge on the Pirna southern bypass will b...

The new bridge on the Pirna southern bypass will be 916 metres long, 70 metres high and require 7,
BRK24E52_404

The new bridge on the Pirna southern bypass will b...

  • Page
  • of
  • 4