
Sujet
Overhead transmission cable installer climbing a mast to install insulated cable on a newly built high-voltage transmission mast
Légende
Overhead transmission cable installer climbing a mast to install insulated cable on a newly built high-voltage transmission mast, Monchenholzhausen, Thuringia, Germany, Europe
Date
13 août 2013
Crédit
Photo12/imageBROKER/Rolf Schulten
Notre référence
BRK19F98_407
Model release
Oui
Property release
NA
Licence
Droits gérés
Format disponible
60,2Mo (1,0Mo) / 31,7cm x 47,5cm / 3744 x 5616 (300dpi)