Schwarze Pumpe lignite-fired power plant operated by LEAG Lausitz Energie Kraftwerke AG. The phase-out of coal-fired power generation is to take place by 2038, 11.11.2021
Légende

Schwarze Pumpe lignite-fired power plant operated by LEAG Lausitz Energie Kraftwerke AG. The phase-out of coal-fired power generation is to take place by 2038, 11.11.2021

Crédit

Photo12/imageBROKER/Jochen Eckel

Notre référence

BRK24E72_465

Model release

NA

Property release

Non

Licence

Droits gérés

Format disponible

78,8Mo (1,6Mo) / 55,9cm x 35,3cm / 6599 x 4173 (300dpi)

Connectez-vous pour télécharger cette image en HD