New power line from Birkenfeld to Ötisheim in the Enzkreis district, 14 kilometre long 380 kV line of the transmission system operator TransnetBW for a secure power supply. 18 solid-wall pylons between 50 and 95 metres high are also being used, Pforzheim, Baden-Württemberg, Germany, Europe
Légende

New power line from Birkenfeld to Ötisheim in the Enzkreis district, 14 kilometre long 380 kV line of the transmission system operator TransnetBW for a secure power supply. 18 solid-wall pylons between 50 and 95 metres high are also being used, Pforzheim, Baden-Württemberg, Germany, Europe

Date

27 mars 2024

Crédit

Photo12/imageBROKER/Arnulf Hettrich

Notre référence

BRK24F86_139

Model release

Non

Property release

Non

Licence

Libre de droits

Format disponible

102,1Mo (4,1Mo) / 61,9cm x 41,3cm / 7313 x 4878 (300dpi)

Connectez-vous pour télécharger cette image en HD