Construction of a new line route, 380 KV extra-high-voltage line between Osterath and Gohr, near Neuss, fitters in line trolleys, on the conductor cables, installing field spacers at great heights, North Rhine-Westphalia, Germany, Europe
Légende

Construction of a new line route, 380 KV extra-high-voltage line between Osterath and Gohr, near Neuss, fitters in line trolleys, on the conductor cables, installing field spacers at great heights, North Rhine-Westphalia, Germany, Europe

Date

29 mars 2021

Crédit

Photo12/imageBROKER/Jochen Tack

Notre référence

BRK25A07_113

Model release

Non

Property release

Non

Licence

Droits gérés

Format disponible

120,7Mo (7,5Mo) / 67,3cm x 44,9cm / 7952 x 5304 (300dpi)

Mots clés

deserted no one No People nobody uninhabited empty new newly construction site construction sites building site building sites new building new buildings new construction new constructions construction constructions Construction site building buildings structure construction constructions care care power supply electricity supply power supplies energy supply high voltage high voltages high-voltage high-voltages power supply line power supply lines power line power pole power poles power pylon power pylons electricity pylon electricity pylons electric pylon electric pylons electricity pole Electricity poles railway track rail railway tracks railroad track rails railroad tracks track tracks rail traffic rail traffic mast masts pylon pylons pole transport transports transportation worker workers labourer Staff Labourers labourers work labour labor work work working works labour labouring labours labor laboring labors Neuss North Rhine-Westphalia NRW Federal State of North Rhine-Westphalia North-Rhine Westphalia German Europe Europe's mechanic mechanics electric electrical construction work construction works building means of transportation means of transportation height heights altitude pylon pylons high voltage pylon high voltage pylons high-voltage pylon high-voltage pylons high voltage tower high-voltage mast high voltage towers high-voltage masts big large great electricity electricity overhead line power line power lines high-voltage line overhead wire overhead lines overhead transmission line high-voltage transmission line Overhead power line HV line HV transmission line HV power line HV power line high-voltage lines high-voltage transmission lines HV lines HV transmission lines HV power lines HV power lines Overhead power lines overhead power line overhead power lines transmission line transmission lines infrastructure infrastructures energy energies european power supply power supplies power industry energy industry power industries Rhineland high tall nurse nursing nurses care caring cares groom grooming grooms means of transportation means of transportation Means of transport install installing installs assemble assembling assembles voltage voltages installation installations cable cables line railway section railway sections train line train track Germany German Federal Republic Republic of Germany FRG BRD railroad line railroad lines railroad track railway line railway track railway lines railway tracks railroad tracks linesman linesmen overhead lineman overhead linesman lineworker overhead line fitters erect erecting erects erected construct constructing constructs built in built erection erections construction open wire open wires aerial line Overhead line conductor rope conductor ropes railway train trains railways railroad railroads Central Europe Middle Europe Manpower Cable route

Connectez-vous pour télécharger cette image en HD