
Légende
Preparation for the demolition of the tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines are demolished, 2 new Siemens SG6.6-170 wind turbines replace them, the WTGs produce twice as much energy, 12 MW power, as the 5 old wind turbines, called repowering, Werl, North Rhine-Westphalia, Germany, Europe
Date
19 juin 2024
Crédit
Photo12/imageBROKER/Jochen Tack
Notre référence
BRK25A78_486
Model release
Non
Property release
Non
Licence
Droits gérés
Format disponible
172,3Mo (2,9Mo) / 53,6cm x 80,5cm / 6336 x 9504 (300dpi)