
Légende
Demolished tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines are demolished, 2 new Siemens SG6.6-170 wind turbines replace them, the 2 new wind turbines produce twice as much energy, 12 MW power, as the 5 old wind turbines, called repowering, demolition work, Werl, North Rhine-Westphalia, Germany, Europe
Date
19 juin 2024
Crédit
Photo12/imageBROKER/Jochen Tack
Notre référence
BRK25B95_447
Model release
Non
Property release
Non
Licence
Droits gérés
Format disponible
166,4Mo (6,9Mo) / 79,1cm x 52,7cm / 9341 x 6227 (300dpi)