
Légende
Preparation for the demolition of the tower of a 20 year old wind turbine, in the Werl wind farm, 5 old Enercon E-66 turbines are demolished, 2 new Siemens SG6.6-170 wind turbines replace them, the WTGs produce twice as much energy, 12 MW power, as the 5 old wind turbines, called repowering, Werl, North Rhine-Westphalia, Germany, Europe
Date
19 juin 2024
Crédit
Photo12/imageBROKER/Jochen Tack
Notre référence
BRK25B95_461
Model release
Non
Property release
Non
Licence
Droits gérés
Format disponible
172,3Mo (3,8Mo) / 80,5cm x 53,6cm / 9504 x 6336 (300dpi)