Red Lion Wharf, Northfleet, Gravesend, Gravesham, Kent, 24/08/1951. Creator: John Laing plc.
Légende
Laing workers preparing the dry dock at Red Lion Wharf, Gravesend, for the first phase in the construction of the cooling water intake caisson for Coryton Oil Refinery. The first stages in the construction of the cooling water intake caisson were carried out at the Red Lion Wharf dry dock, Gravesend. Before work could begin, the site had to be prepared. A thick layer of mud which had been deposited by the tide was removed and the entrance to the dock was closed. On 30th November 1951, when the first construction phase was complete, the caisson was towed across the Thames to Tilbury Docks. Construction of the caisson was completed at Tilbury, and it was finally transported to Coryton in March 1952.
Date
1951
Crédit
Photo12/Heritage Images/Historic England
Notre référence
HRM21A84_041
Model release
Non
Property release
Non
Licence
Droits gérés
Format disponible
92,4Mo (3,6Mo) / 46,2cm x 50,1cm / 5454 x 5919 (300dpi)