
Sujet
Mersey oil pipeline..., showing the pipeline after the welders have passed..., 24/09/1967. Creator: John Laing plc.
Légende
A view along a stretch of the Mersey oil pipeline in rolling countryside, showing the pipeline after the welders have passed but before the joints have been coated. The Mersey oil pipeline was installed in 1967 by Laing Civil Engineering in association with the French companies, Entrepose and Grands Trevaux de Marseille (GTM). It is 88 miles in length and runs from Ellesmere Port to the Kingsbury Oil Terminal serving the Midlands. This photograph was published in November 1967 in the Laing monthly newsletter 'Team Spirit'.
Date
1967
Crédit
Photo12/Heritage Images/Historic England
Notre référence
HRM21A84_377
Model release
Non
Property release
Non
Licence
Droits gérés
Format disponible
75,9Mo (,0Ko) / 44,3cm x 42,9cm / 5236 x 5066 (300dpi)