
Sujet
Construction of the M1 Motorway, South Northamptonshire, Northamptonshire, 16/05/1958. Creator: John Laing plc.
Légende
Laing workers constructing a concrete arched culvert in Section C2 of the M1, the London to Yorkshire Motorway. Section C of the London to Yorkshire Motorway is between Gayhurst and Kislingbury in South Northamptonshire. The caption beneath the corresponding album print reads '7'6" span arch culvert built in mass concrete in three stages. Location: chainage 22,000.'
Date
1958
Crédit
Photo12/Heritage Images/Historic England Archive
Notre référence
HRM21B15_429
Model release
Non
Property release
Non
Licence
Droits gérés
Format disponible
61,0Mo (2,5Mo) / 44,7cm x 34,2cm / 5283 x 4035 (300dpi)