A prefab bathroom unit about to be put into place on a block of flats being constructed in nowa huta in the krakow province in poland, september 1962, these buildings are being constructed using an experimental method called 'dominoes' from precast units, only six workers are employed at this site.
Sujet

A prefab bathroom unit about to be put into place on a block of flats being constructed in nowa huta in the krakow province in poland, september 1962, these buildings are being constructed using an experimental method called 'dominoes' from precast units, only six workers are employed at this site.

Légende

A prefab bathroom unit about to be put into place on a block of flats being constructed in nowa huta in the krakow province in poland, september 1962, these buildings are being constructed using an experimental method called 'dominoes' from precast units, only six workers are employed at this site.

Date

01 févr. 2013

Crédit

Photo12/Sovfoto/UIG

Notre référence

UMG20B01_168

Model release

Non

Property release

Non

Licence

Droits gérés

Format disponible

56,4Mo (7,6Mo) / 32,7cm x 43,2cm / 3862 x 5100 (300dpi)

Restrictions

Utilisation éditoriale uniquement.

Connectez-vous pour télécharger cette image en HD