
Sujet
Space Shuttle Discovery
Légende
KENNEDY SPACE CENTER, FLA. - After leaving the Vehicle Assembly Building, the Space Shuttle Discovery makes its slow - up to 1 mile per hour - trek along the crawlerway to Launch Pad 39A in preparation for the STS-82 mission. The Shuttle is assembled on a Mobile Launcher Platform, seen in this view taken from above, and the entire assemblage is carried out to the launch pad on the crawler transporter, which is underneath the MLP. A seven-member crew will perform the second servicing of the orbiting Hubble Space Telescope (HST) during the 10-day STS-82 mission, which is targeted for a Feb. 11 liftoff.
Info+
.
Date
17 janv. 1997
Crédit
Photo12/Universal Images Group
Notre référence
UMG22A40_019
Licence
Droits gérés
Format disponible
9,8Mo (790,1Ko) / 13,0cm x 18,9cm / 1530 x 2238 (300dpi)