Période

516 résultats pour : alternative route

  • Page
  • sur
  • 6
Connectez-vous pour plus de résultats
Motorway A3 near Flörsheim, in front of the Mönchhof motorway junction, narrowing of lanes due to
BRK25B86_418

Motorway A3 near Flörsheim, in front of the Mönchh...

The Heyden power plant, coal-fired power plant, which was shut down in July 2021 and kept as a grid
BRK25B68_100

The Heyden power plant, coal-fired power plant, wh...

The Heyden power plant, coal-fired power plant, which was shut down in July 2021 and kept as a grid
BRK25B95_460

The Heyden power plant, coal-fired power plant, wh...

The Heyden power plant, coal-fired power plant, which was shut down in July 2021 and kept as a grid
BRK25B95_476

The Heyden power plant, coal-fired power plant, wh...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld-Waldbauer, with
BRK25B86_370

Transport of a 68 metre long, 22 tonne blade of a ...

There was a serious accident between a train on the Weißeritz Valley Railway and a lorry from the
BRK25B89_072

There was a serious accident between a train on th...

High-voltage power line route, the space underneath is used for a solar park over 5 km long, behind
BRK25B67_438

High-voltage power line route, the space underneat...

High-voltage power line route, the space underneath is used for a solar park over 5 km long, behind
BRK25B79_276

High-voltage power line route, the space underneat...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK25B86_361

Transport of a 68 metre long, 22 tonne blade of a ...

The Kennedy Bridge, the middle of Bonn's 3 Rhine bridges, connects the centre of Bonn and the Beuel
BRK25B96_224

The Kennedy Bridge, the middle of Bonn's 3 Rhine b...

Pedal and solar powered taxi vehicle Rotterdam, Netherlands
BRK25B91_252

Pedal and solar powered taxi vehicle Rotterdam, Ne...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25B95_463

Transport of a 68 metre long, 22 tonne blade of a ...

There was a serious accident between a train on the Weißeritz Valley Railway and a lorry from the
BRK25B97_122

There was a serious accident between a train on th...

A45 motorway, coming from the south, traffic is diverted in front of the Lüdenscheid junction, in
BRK25B69_363

A45 motorway, coming from the south, traffic is di...

A45 motorway, the Rahmede viaduct, which is totally closed due to massive damage to the supporting
BRK25B96_374

A45 motorway, the Rahmede viaduct, which is totall...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25B86_340

Transport of a 68 metre long, 22 tonne blade of a ...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B95_453

Preparation for the transport of a 68 metre long b...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B68_028

Preparation for the transport of a 68 metre long b...

Wind farm near Niederaußen, high-voltage power lines, town of Bergheim, storm, strong wind, wind
BRK25B68_091

Wind farm near Niederaußen, high-voltage power lin...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK25B77_463

Transport of a 68 metre long, 22 tonne blade of a ...

Motorway A3 near Flörsheim, narrowing of lanes due to roadworks, Hesse, Germany, Europe
BRK25B78_008

Motorway A3 near Flörsheim, narrowing of lanes due...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25B86_341

Transport of a 68 metre long, 22 tonne blade of a ...

Essen, North Rhine-Westphalia, Germany - Fridays for Future, climate activists demonstrate in times
BRK25B72_070

Essen, North Rhine-Westphalia, Germany - Fridays f...

Iserlohn, North Rhine-Westphalia, Germany - Autonomous electric buses at the city railway station,
BRK25B99_175

Iserlohn, North Rhine-Westphalia, Germany - Autono...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B22_249

Preparation for the transport of a 68 metre long b...

A3 motorway near Flörsheim, in front of the Mönchhof motorway junction, narrowing of the lanes due
BRK25B26_270

A3 motorway near Flörsheim, in front of the Mönchh...

The Heyden power plant, coal-fired power plant, which was shut down in July 2021 and kept as a grid
BRK25B29_122

The Heyden power plant, coal-fired power plant, wh...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B29_150

Preparation for the transport of a 68 metre long b...

Sculpture by Richard Serra, Bramme for the Ruhr area on the Schurenbach spoil tip, photographer,
BRK25B11_117

Sculpture by Richard Serra, Bramme for the Ruhr ar...

Wind farm, power line, high-voltage pylons, east of Bad Wünnenberg, OWL, North Rhine-Westphalia,
BRK25B44_045

Wind farm, power line, high-voltage pylons, east o...

Gohlis windmill
BRK25B17_085

Gohlis windmill

The Heyden power plant, coal-fired power plant, which was shut down in July 2021 and kept as a grid
BRK25B21_066

The Heyden power plant, coal-fired power plant, wh...

High-voltage power line route, the space underneath is used for a solar park over 5 km long, behind
BRK25B26_472

High-voltage power line route, the space underneat...

Wind farm in the fog, high-voltage pylons, dark doldrums, no wind no direct sunlight, in the
BRK25B31_262

Wind farm in the fog, high-voltage pylons, dark do...

The Heyden power plant, coal-fired power plant, which was shut down in July 2021 and kept as a grid
BRK25B36_079

The Heyden power plant, coal-fired power plant, wh...

Sculpture by Richard Serra, slab for the Ruhr area on the Schurenbach slag heap, digesters of the
BRK25B37_277

Sculpture by Richard Serra, slab for the Ruhr area...

High-voltage power line route, the space underneath is used for a solar park over 5 km long, behind
BRK25B42_490

High-voltage power line route, the space underneat...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK25B09_104

Transport of a 68 metre long, 22 tonne blade of a ...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B09_108

Preparation for the transport of a 68 metre long b...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, onlookers, with a
BRK25B29_139

Transport of a 68 metre long, 22 tonne blade of a ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld-Waldbauer, with
BRK25B36_034

Transport of a 68 metre long, 22 tonne blade of a ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25B36_049

Transport of a 68 metre long, 22 tonne blade of a ...

The UNIPER coal-fired power plant Datteln 4, power plant unit and cooling tower, Nordex N149/5.X
BRK25B02_211

The UNIPER coal-fired power plant Datteln 4, power...

There was a serious accident between a train on the Weißeritz Valley Railway and a lorry from the
BRK25B29_449

There was a serious accident between a train on th...

There was a serious accident between a train on the Weißeritz Valley Railway and a lorry from the
BRK25B38_034

There was a serious accident between a train on th...

The F60 overburden conveyor bridge visitor mine is located on Bergheider See near the village of
BRK25B45_405

The F60 overburden conveyor bridge visitor mine is...

There was a serious accident between a train on the Weißeritz Valley Railway and a lorry from the
BRK25B46_494

There was a serious accident between a train on th...

EON coal-fired power station Scholven, Gelsenkirchen, in the back, in front the double headframe of
BRK25B35_117

EON coal-fired power station Scholven, Gelsenkirch...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25B43_432

Transport of a 68 metre long, 22 tonne blade of a ...

Wind farm in the fog, high-voltage pylons, dark doldrums, no wind no direct sunlight, in the
BRK25B05_221

Wind farm in the fog, high-voltage pylons, dark do...

Wind farm in the fog, high-voltage pylons, dark doldrums, no wind no direct sunlight, in the
BRK25B08_099

Wind farm in the fog, high-voltage pylons, dark do...

Wind farm in the fog, high-voltage pylons, dark doldrums, no wind no direct sunlight, in the
BRK25B08_100

Wind farm in the fog, high-voltage pylons, dark do...

Bus stop in the countryside, on the B68, new, modern bus shelter, line to Warburg, Ostwestfalen
BRK25B09_138

Bus stop in the countryside, on the B68, new, mode...

The F60 overburden conveyor bridge visitor mine is located on Bergheider See near the village of
BRK25B18_373

The F60 overburden conveyor bridge visitor mine is...

Wind farm, north of Marsberg-Meerhof, winter, slightly snowy landscape, North Rhine-Westphalia,
BRK25B10_357

Wind farm, north of Marsberg-Meerhof, winter, slig...

Motorway A45, the Rahmede viaduct, which is totally closed due to massive damage to the supporting
BRK25B21_177

Motorway A45, the Rahmede viaduct, which is totall...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25B21_057

Preparation for the transport of a 68 metre long b...

High-voltage power lines, overhead pylons, UNIPER coal-fired power plant Scholven in the
BRK25B21_084

High-voltage power lines, overhead pylons, UNIPER ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, onlookers, with a
BRK25B36_048

Transport of a 68 metre long, 22 tonne blade of a ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK25B43_435

Transport of a 68 metre long, 22 tonne blade of a ...

Essen, North Rhine-Westphalia, Germany - Fridays for Future, climate activists demonstrate in times
BRK25B31_389

Essen, North Rhine-Westphalia, Germany - Fridays f...

Essen, North Rhine-Westphalia, Germany - Fridays for Future, climate activists demonstrate in times
BRK25B31_390

Essen, North Rhine-Westphalia, Germany - Fridays f...

Gladbeck, Ruhr area, North Rhine-Westphalia, Germany, wind turbine on the Mottbruchhalde, a spoil
BRK25B01_189

Gladbeck, Ruhr area, North Rhine-Westphalia, Germa...

There was a serious accident between a train on the Weißeritz Valley Railway and a lorry from the
BRK25A51_040

There was a serious accident between a train on th...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25A52_142

Preparation for the transport of a 68 metre long b...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25A52_146

Transport of a 68 metre long, 22 tonne blade of a ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25A75_353

Transport of a 68 metre long, 22 tonne blade of a ...

The Kennedy Bridge, the middle of Bonn's 3 Rhine bridges, connects the centre of Bonn and the Beuel
BRK25A82_420

The Kennedy Bridge, the middle of Bonn's 3 Rhine b...

A45 motorway, coming from the south, traffic is diverted in front of the Lüdenscheid junction, in
BRK25A52_247

A45 motorway, coming from the south, traffic is di...

A45 motorway, the Rahmede viaduct, which is totally closed due to massive damage to the supporting
BRK25A75_310

A45 motorway, the Rahmede viaduct, which is totall...

High-voltage power line route, with a wind farm behind it, in the harbour area of Vlissingen-Oost,
BRK25A76_285

High-voltage power line route, with a wind farm be...

There was a serious accident between a train on the Weißeritz Valley Railway and a lorry from the
BRK25A66_085

There was a serious accident between a train on th...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld-Waldbauer, with
BRK25A59_270

Transport of a 68 metre long, 22 tonne blade of a ...

High-voltage power lines, overhead pylons, UNIPER coal-fired power plant Scholven in the
BRK25A66_176

High-voltage power lines, overhead pylons, UNIPER ...

Roadworks, traffic congestion, traffic situation, obstruction, traffic flow, warning signs, speed,
BRK25A51_464

Roadworks, traffic congestion, traffic situation, ...

The Heyden power plant, coal-fired power plant, which was shut down in July 2021 and kept as a grid
BRK25A59_179

The Heyden power plant, coal-fired power plant, wh...

The Kennedy Bridge, the middle of Bonn's 3 Rhine bridges, connects the centre of Bonn and the
BRK25A82_421

The Kennedy Bridge, the middle of Bonn's 3 Rhine b...

View from the Hoheward spoil tip, at sunset, to the west, Ewald mine, UNIPER Scholven combined heat
BRK25A75_258

View from the Hoheward spoil tip, at sunset, to th...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld-Waldbauer, with
BRK25A31_024

Transport of a 68 metre long, 22 tonne blade of a ...

The F60 overburden conveyor bridge visitor mine is located on Bergheider See near the village of
BRK25A07_451

The F60 overburden conveyor bridge visitor mine is...

The F60 overburden conveyor bridge visitor mine is located on Bergheider See near the village of
BRK25A14_072

The F60 overburden conveyor bridge visitor mine is...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25A25_044

Preparation for the transport of a 68 metre long b...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25A25_052

Transport of a 68 metre long, 22 tonne blade of a ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK25A31_038

Transport of a 68 metre long, 22 tonne blade of a ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25A37_022

Transport of a 68 metre long, 22 tonne blade of a ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, with a
BRK25A44_302

Transport of a 68 metre long, 22 tonne blade of a ...

Wind farm near Brilon-Radlinghausen, high-voltage power lines, Sauerland, North Rhine-Westphalia,
BRK25A44_354

Wind farm near Brilon-Radlinghausen, high-voltage ...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Schwelm, onlookers, with a
BRK25A10_105

Transport of a 68 metre long, 22 tonne blade of a ...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25A04_329

Preparation for the transport of a 68 metre long b...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK25A25_042

Transport of a 68 metre long, 22 tonne blade of a ...

Lignite-fired power plant, RWE Power AG Niederaußem power plant, wind power plants, 2 units were
BRK25A25_068

Lignite-fired power plant, RWE Power AG Niederauße...

Part of a line route, 380 KV extra-high-voltage line, district town of Bergheim, Rhein-Kreis-Neuss,
BRK25A31_097

Part of a line route, 380 KV extra-high-voltage li...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK25A37_018

Transport of a 68 metre long, 22 tonne blade of a ...

A3 motorway near Flörsheim, in front of the Mönchhof motorway junction, narrowing of lanes due to
BRK25A40_087

A3 motorway near Flörsheim, in front of the Mönchh...

High-voltage power line route, the space underneath is used for a solar park over 5 km long, behind
BRK25A42_465

High-voltage power line route, the space underneat...

High-voltage power line route, the space underneath is used for a solar park over 5 km long, behind
BRK25A43_497

High-voltage power line route, the space underneat...

Transport of a 68 metre long, 22 tonne blade of a wind turbine, here in Breckerfeld, with a
BRK25A44_305

Transport of a 68 metre long, 22 tonne blade of a ...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25A07_076

Preparation for the transport of a 68 metre long b...

Extra-high-voltage lines, 380 KV, power line, wind turbine, the electricity comes from the Rhenish
BRK25A07_083

Extra-high-voltage lines, 380 KV, power line, wind...

Preparation for the transport of a 68 metre long blade, a wind turbine, with a self-propelled
BRK25A19_087

Preparation for the transport of a 68 metre long b...

  • Page
  • sur
  • 6